共 17 条
- [1] Pilot repair-insulating works in cenomanian wells of Urengoy GNKM NEFTYANOE KHOZYAISTVO, 2005, (11): : 73 - 77
- [3] AUTOMATIZATION OF DESIGNING WORKS ON OIL-FIELD DEVELOPMENT NEFTYANOE KHOZYAISTVO, 1989, (08): : 32 - 36
- [4] OIL-FIELD DEVELOPMENT OPTIMIZATION (FOR PURPOSES OF DISCUSSION) NEFTYANOE KHOZYAISTVO, 1994, (07): : 16 - 20
- [5] THE HAVEN OIL-FIELD - DEVELOPMENT OF A TINY MARGINAL FIELD WITH HORIZONTAL WELLS JOURNAL OF PETROLEUM TECHNOLOGY, 1992, 44 (04): : 496 - 501
- [6] FURTHER IMPROVEMENT OF AUTOMATIZATION OF OIL-FIELD DEVELOPMENT PROJECT NEFTYANOE KHOZYAISTVO, 1988, (04): : 36 - 39
- [7] INTRODUCTION OF PRS PACKING DEVICES IN REPAIR OPERATIONS IN WELLS IN SAMOOTLOR OIL-FIELD NEFTYANOE KHOZYAISTVO, 1992, (06): : 44 - 45
- [8] RESULTS AND MEANS FOR THE INCREASED EFFICIENCY IN GAS AND OIL-FIELD DEVELOPMENT NEFTYANOE KHOZYAISTVO, 1986, (02): : 77 - 79
- [9] THE FUTURE OF HORIZONTAL AND MULTIPLE BOTTOM WELLS RELATING TO OIL-FIELD DEVELOPMENT NEFTYANOE KHOZYAISTVO, 1991, (09): : 37 - 39
- [10] TO INCREASE THE EFFICIENCY OF GEOPHYSICAL WORKS, QUALITY OF PREPARING OIL-FIELD DEVELOPMENT NEFTYANOE KHOZYAISTVO, 1989, (06): : 3 - 7