共 50 条
- [1] A HYBRID METAHEURISTIC FOR SOLVING SINGLE MACHINE SCHEDULING PROBLEM [J]. ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 68 - 74
- [2] Backbone guided tabu search for solving the UBQP problem [J]. JOURNAL OF HEURISTICS, 2013, 19 (04) : 679 - 695
- [3] Backbone guided tabu search for solving the UBQP problem [J]. Journal of Heuristics, 2013, 19 : 679 - 695
- [7] A hybrid metaheuristic method for solving resource constrained project scheduling problem [J]. Evolutionary Intelligence, 2023, 16 : 519 - 537