Getting a handle on improved operation

被引:0
|
作者
Avery, Amos [1 ]
Williams, Steve
机构
[1] Remote Handling DESTACO, Auburn Hills, MI USA
来源
NUCLEAR ENGINEERING INTERNATIONAL | 2017年 / 62卷 / 757期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:34 / 35
页数:2
相关论文
共 50 条
  • [1] Getting a handle on biosolids
    Renner, Rebecca
    ENVIRONMENTAL HEALTH PERSPECTIVES, 2008, 116 (06) : A258 - A258
  • [2] Getting a handle on data
    Van, Daelen, Ton
    Scientific Computing and Instrumentation, 2001, 18 (06): : 67 - 68
  • [3] GETTING A HANDLE ON PRODUCTIVITY
    STEINMAN, GR
    MAYNARD, H
    SHINBERG, RJ
    SCHELM, R
    GOTTENBERG, N
    CURRY, B
    VESLEY, A
    MULLIN, RM
    INFOSYSTEMS, 1986, 33 (08): : 24 - &
  • [4] Getting a handle on biosynthesis
    Boothby, Clare
    DALTON TRANSACTIONS, 2007, (33) : B65 - B65
  • [5] Getting a handle on the situation
    Bonnema, L.
    1600, Dana Chase Publications Inc. (58):
  • [6] GETTING A HANDLE ON CREDIT
    DUNNAN, N
    ABA JOURNAL, 1991, 77 : 90 - 91
  • [7] Getting a handle on grippers
    Guelker, Michael
    Design Engineering (Canada), 2021, 66 (02): : 22 - 24
  • [8] Getting a handle on biosynthesis
    Boothby, Clare
    CHEMICAL COMMUNICATIONS, 2007, (33) : B65 - B65
  • [9] Getting a handle on data
    Paul Smaglik
    Nature, 2001, 413 (6858) : 3 - 3
  • [10] Getting a handle on TriSpectives
    Smith, AD
    COMPUTER-AIDED ENGINEERING, 1996, 15 (03): : 28 - &