Simulation and optimization of a full-scale Carrousel oxidation ditch plant for municipal wastewater treatment

被引:32
|
作者
Xie, Wen-Ming [2 ]
Zhang, Rui [2 ]
Li, Wen-Wei [1 ]
Ni, Bing-Jie [1 ]
Fang, Fang [1 ]
Sheng, Guo-Ping [1 ]
Yu, Han-Qing [1 ]
Song, Jing [3 ]
Le, De-Zhi [4 ]
Bi, Xue-Jun [4 ]
Liu, Chang-Qing [4 ]
Yang, Min [5 ]
机构
[1] Univ Sci & Technol China, Dept Chem, Hefei 230026, Peoples R China
[2] Univ Sci & Technol China, Sch Earth & Space Sci, Hefei 230026, Peoples R China
[3] Hefei Univ Technol, Sch Resource & Environm Engn, Hefei 230009, Peoples R China
[4] Qingdao Technol Univ, Sch Environm & Municipal Engn, Qingdao 266033, Peoples R China
[5] Chinese Acad Sci, Ecoenvironm Sci Res Ctr, State Key Lab Environm Aquat Chem, Beijing 100085, Peoples R China
关键词
Activated sludge; Bioreactor; Modeling; Optimization; Treatment plant; Wastewater; ACTIVATED-SLUDGE PROCESS; PARAMETERS; REMOVAL; MODEL;
D O I
10.1016/j.bej.2011.04.010
中图分类号
Q81 [生物工程学(生物技术)]; Q93 [微生物学];
学科分类号
071005 ; 0836 ; 090102 ; 100705 ;
摘要
A full-scale Carrousel oxidation ditch wastewater treatment plant (WWTP) was simulated and optimized through integrating the activated sludge model 2d (ASM2d), support vector regression (SVR) and accelerating genetic algorithm (AGA). The ASM2d model after calibration and validation with the operating data was used to simulate the process. Operating parameters, including hydraulic retention times (HRTs) of anaerobic, anoxic and aerobic tanks, solids retention time (SRT) and internal recirculation ratio were subjected to optimization using SVR and AGA. The simulation results were normalized and SVR was employed to correlate the operating factors and the effluent quality. Then, the AGA approach was used to obtain the optimal operating conditions. The multiple-objective optimization with different weights indexes was adopted to achieve simultaneous nutrient removal. Compared with the present operating conditions, the HRT of the anoxic tank, the internal recirculation ratio and the SRT should be reduced, while the HRT of the aerobic tank should be prolonged to achieve better effluent quality. Such an integrated approach in this study offers an effective and useful tool to optimize the oxidation ditch process of WWTPs. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:9 / 16
页数:8
相关论文
共 50 条
  • [1] Enhancing nitrogen removal in an Orbal oxidation ditch by optimization of oxygen supply: practice in a full-scale municipal wastewater treatment plant
    Zhou, Xin
    Guo, Xuesong
    Han, Yunping
    Liu, Junxin
    Ren, Jincheng
    Wang, Yu
    Guo, Yantao
    [J]. BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2012, 35 (07) : 1097 - 1105
  • [2] Enhancing nitrogen removal in an Orbal oxidation ditch by optimization of oxygen supply: practice in a full-scale municipal wastewater treatment plant
    Xin Zhou
    Xuesong Guo
    Yunping Han
    Junxin Liu
    Jincheng Ren
    Yu Wang
    Yantao Guo
    [J]. Bioprocess and Biosystems Engineering, 2012, 35 : 1097 - 1105
  • [3] Determination of phosphite in a full-scale municipal wastewater treatment plant
    Yu, Xiaolong
    Geng, Jinju
    Ren, Hongqiang
    Chao, Han
    Qiu, Huimin
    [J]. ENVIRONMENTAL SCIENCE-PROCESSES & IMPACTS, 2015, 17 (02) : 441 - 447
  • [4] Modeling and Simulation of the Sequencing Batch Reactor at a Full-Scale Municipal Wastewater Treatment Plant
    Ni, Bing-Jie
    Xie, Wen-Ming
    Liu, Shao-Gen
    Yu, Han-Qing
    Wang, Ying-Zhe
    Gan-Wang
    Dai, Xian-Liang
    [J]. AICHE JOURNAL, 2009, 55 (08) : 2186 - 2196
  • [5] Flow field prediction in full-scale Carrousel oxidation ditch by using computational fluid dynamics
    Yang, Yin
    Wu, Yingying
    Yang, Xiao
    Zhang, Kai
    Yang, Jiakuan
    [J]. WATER SCIENCE AND TECHNOLOGY, 2010, 62 (02) : 256 - 265
  • [6] Full-scale blending treatment of fresh MSWI leachate with municipal wastewater in a wastewater treatment plant
    Ye, Zhi-Long
    Xie, Xiaoqing
    Dai, Lanhua
    Wang, Ziwen
    Wu, Wenhua
    Zhao, Fuyi
    Xie, Xiaoming
    Huang, Shiqing
    Liu, Meiling
    Chen, Shaohua
    [J]. WASTE MANAGEMENT, 2014, 34 (11) : 2305 - 2311
  • [7] Full-scale sludge reduction in the water line of municipal wastewater treatment plant
    Di Iaconi, Claudio
    De Sanctis, Marco
    Altieri, Valerio Guido
    [J]. Journal of Environmental Management, 2020, 269
  • [8] Monitoring Microbial Diversity of a Full-Scale Municipal Wastewater Treatment Plant in Dubai
    Khan, Munawwar Ali
    Mohsin, Javeria
    Faheem, Sultan Mohammad
    [J]. 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND DEVELOPMENT- ICESD 2013, 2013, 5 : 102 - 106
  • [9] Full-scale sludge reduction in the water line of municipal wastewater treatment plant
    Di Iaconi, Claudio
    De Sanctis, Marco
    Altieri, Valerio Guido
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2020, 269
  • [10] Simulation of Component Distributions in a Full-Scale Carrousel Oxidation Ditch: A Model Coupling Sludge-Wastewater Two-Phase Turbulent Hydrodynamics with Bioreaction Kinetics
    Zhang, Daijun
    Guo, Lisha
    Xu, Danyu
    Chen, Yuan
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2010, 27 (02) : 159 - 168