共 50 条
- [2] TRANSIENT PROCESSES IN THE START-UP PERIOD OF BOILERS WITH NATURAL CIRCULATION [J]. ENERGIA ES ATOMTECHNIKA, 1981, 34 (11): : 495 - 498
- [3] Start-up behaviour of a natural circulation evaporator in brewing industry [J]. BREWING SCIENCE, 2007, 60 (5-6): : 64 - 73
- [4] TRANSIENT-BEHAVIOR OF SUPERHEATERS DURING COLD START-UP OF STEAM-GENERATORS WITH NATURAL CIRCULATION [J]. ENERGIA ES ATOMTECHNIKA, 1983, 36 (01): : 14 - 18
- [8] New start-up curves for a 200 MW steam boiler with natural circulation [J]. XI INTERNATIONAL CONFERENCE ON COMPUTATIONAL HEAT, MASS AND MOMENTUM TRANSFER (ICCHMT 2018), 2018, 240