Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times

被引:32
|
作者
Allahverdi, A [1 ]
Aldowaisan, T [1 ]
机构
[1] Kuwait Univ, Dept Mech & Ind Engn, Coll Engn & Petr, Safat, Kuwait
关键词
two-machine flowshop; setup time; no-wait; completion time; heuristics;
D O I
10.1057/palgrave.jors.2601110
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the problem of minimizing total completion time in a two-machine no-wait flowshop where setup times of the jobs are sequence-dependent. Optimal solutions are obtained for two special flowshops and a dominance relation is developed for the general problem. Several heuristic algorithms with the computational complexity of O(n(2)) and O(n(3)) are constructed. The heuristics consist of two phases: in the first phase a starting list is developed and in the second a repeated insertion technique is applied. Computational experience demonstrates that the concept of repeated insertion application is quite useful for any starting list and that solutions for all starting lists converge to about the same value of less than 1% after a few iterations.
引用
下载
收藏
页码:449 / 462
页数:14
相关论文
共 50 条
  • [1] Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times
    Behjat, Saeed
    Salmasi, Nasser
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (01) : 22 - 48
  • [2] A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times
    Nagano, Marcelo Seido
    Miyata, Hugo Hissashi
    Araujo, Daniella Castro
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 224 - 230
  • [3] New heuristics for the no-wait flowshop with sequence-dependent setup times problem
    Nagano, Marcelo Seido
    Araujo, Daniella Castro
    JOURNAL OF THE BRAZILIAN SOCIETY OF MECHANICAL SCIENCES AND ENGINEERING, 2014, 36 (01) : 139 - 151
  • [4] An Effective Heuristic for the No-Wait Flowshop with Sequence-Dependent Setup Times Problem
    Araujo, Daniella Castro
    Nagano, Marcelo Seido
    ADVANCES IN ARTIFICIAL INTELLIGENCE, MICAI 2010, PT I, 2010, 6437 : 187 - 196
  • [5] Iterative algorithms for no-wait flowshop problems with sequence-dependent setup times
    Zhu, Xia
    Li, Xiaoping
    Gupta, Jatinder N. D.
    2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 1252 - 1257
  • [6] New heuristics for the no-wait flowshop with sequence-dependent setup times problem
    Marcelo Seido Nagano
    Daniella Castro Araújo
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2014, 36 : 139 - 151
  • [7] NEW HEURISTICS FOR THE NO-WAIT FLOWSHOP WITH SEQUENCE-DEPENDENT SETUP TIMES PROBLEM
    Araujo, Danielle Castro
    Naganoa, Marcelo Seido
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2015, 12 (02) : 180 - 194
  • [8] MINIMIZING TOTAL COMPLETION TIME IN A TWO-MACHINE NO-WAIT FLOWSHOP WITH UNCERTAIN AND BOUNDED SETUP TIMES
    Allahverdi, Muberra
    Allahverdi, Ali
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2020, 16 (05) : 2439 - 2457
  • [9] Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times
    Cheng, Chen-Yang
    Ying, Kuo-Ching
    Li, Shu-Fen
    Hsieh, Ya-Chu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 130 : 338 - 347
  • [10] An ALNS to optimize makespan subject to total completion time for no-wait flow shops with sequence-dependent setup times
    de Almeida, Fernando Siqueira
    Nagano, Marcelo Seido
    TOP, 2024, 32 (02) : 304 - 322