A cost-effective simulation algorithm for inspection interval optimization: An application to mining equipment

被引:18
|
作者
Golbasi, Onur [1 ]
Demirel, Nuray [1 ]
机构
[1] Middle East Tech Univ, Dept Min Engn, TR-06800 Ankara, Turkey
关键词
Inspection interval; Optimization; Delay time; Production systems; Maintenance cost; RELIABILITY-ANALYSIS; REPAIRABLE SYSTEMS; MAINTAINABILITY ANALYSIS; PREVENTIVE MAINTENANCE; MODEL; POLICY; REPLACEMENT; COMPONENT; DETERIORATION; MACHINE;
D O I
10.1016/j.cie.2017.09.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In machinery maintenance policies, regular inspection intervals should be specified in such a way that the cumulative of direct and indirect financial consequences of maintenance activities should be minimized while supporting the functional health of system components. This study aims to develop a simulation algorithm, called the time-counter, to optimize inspection intervals. In the algorithm, uptime and downtime behaviors of the system components and production losses in the corrective repairs are considered random values. Delay time concept is regarded when estimating failure detection periods and deciding on the required maintenance type. In addition, the developed model is applied to two active draglines and their inspection intervals are optimized as 232 and 184 h for Dragline-1 and Dragline-2, respectively. The optimized values are observed to decrease the total maintenance costs by 5.9 and 6.2 percent for the given draglines, compared to the current interval of 160 h. The main novelties of the study are that (i) the proposed concept which allows for simultaneous assessment of system components in an incremental time span has not been proposed in the literature when deciding on optimal inspection intervals, (ii) it is the first initiative in inspection optimization of a mining machinery system, and (iii) it uses real datasets on lifetime, repair time, and financial values that are rarely observed in maintenance studies. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:525 / 540
页数:16
相关论文
共 50 条
  • [1] COST-EFFECTIVE PREVENTION OF EQUIPMENT FAILURE IN THE MINING-INDUSTRY
    DREYER, E
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1995, 61 (2-3) : 329 - 347
  • [2] Optimization of a Cost-Effective Diagnostic ANA Algorithm
    Cauchie, Mathieu
    Cruyssen, Bert Vander
    Van den Bremt, Stefanie
    Stubbe, Muriel
    Bossuyt, Xavier
    Van Hoovels, Lieve
    ARTHRITIS & RHEUMATOLOGY, 2017, 69
  • [3] COST-EFFECTIVE MEAT INSPECTION
    HATHAWAY, SC
    MCKENZIE, AI
    ROYAL, WA
    VETERINARY RECORD, 1987, 120 (04) : 78 - 78
  • [4] Cost-effective response to equipment failure
    McHaney, JH
    Williamson, GC
    HYDROCARBON PROCESSING, 1996, 75 (10): : 75 - +
  • [5] A Research on Cost-effective Coal Mining
    Zheng Xincheng
    PROCEEDINGS OF THE 6TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CSR: TECHNOLOGICAL INNOVATION AND MANAGEMENT SCIENCE SESSION, PT IV, 2010, : 178 - 181
  • [6] Algorithm for cost-effective capital equipment replacement: An analysis of anesthesia gas machines
    Weiss, CI
    Rock, P
    Hertzler, LW
    McWhirter, L
    Nelson, C
    ANESTHESIOLOGY, 1999, 91 (3A) : U277 - U277
  • [7] Sensabot: A safe and cost-effective inspection solution
    1600, Society of Petroleum Engineers (SPE) (64):
  • [8] Cost-effective equipment of rolling stock with ETCS
    Mindel, Klaus
    Scheck, Oliver
    ZEVrail, 2011, 135 (SUPPL.): : 32 - 39
  • [9] A cost-effective algorithm for the solution of engineering problems with particle swarm optimization
    Tomassetti, Giordano
    ENGINEERING OPTIMIZATION, 2010, 42 (05) : 471 - 495
  • [10] COST-EFFECTIVE COMPUTING TOOLS FOR MINING ENGINEERS
    FERGUSON, GA
    CIM BULLETIN, 1987, 80 (899): : 53 - 53