Evaluation criteria for holonic control implementations in manufacturing systems

被引:5
|
作者
Kruger, Karel [1 ]
Basson, Anton H. [1 ]
机构
[1] Stellenbosch Univ, Dept Mech & Mechatron Engn, Stellenbosch, South Africa
关键词
Holonic manufacturing system (HMS); reconfigurable manufacturing system (RMS); evaluation criteria; SOFTWARE; PRODUCTIVITY; ARCHITECTURE; DESIGN;
D O I
10.1080/0951192X.2018.1550674
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Holonic control architectures have often been implemented in research on modern manufacturing systems. Although many holonic control systems were implemented using agent-based programming platforms, other platforms hold potential advantages. However, to make an informed decision on which implementation platform/language to use requires a set of evaluation criteria. This paper presents such a set of evaluation criteria that are focussed on the implementation of holonic control in manufacturing systems. The evaluation criteria are formulated from a review of literature, combined with experience in developing holonic control implementations. The most important characteristics, requirements and performance measures are identified and discussed.
引用
收藏
页码:148 / 158
页数:11
相关论文
共 50 条
  • [1] Holonic control of manufacturing systems
    Monostori, L
    Kádár, B
    [J]. MULTI-AGENT-SYSTEMS IN PRODUCTION, 2000, : 103 - 108
  • [2] Evaluation of JADE multi-agent system and Erlang holonic control implementations for a manufacturing cell
    Kruger, Karel
    Basson, Anton H.
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2019, 32 (03) : 225 - 240
  • [3] Requirements for holonic manufacturing systems control
    Balasubramanian, S
    Brennan, RW
    Norrie, DH
    [J]. 11TH INTERNATIONAL WORKSHOP ON DATABASE AND EXPERT SYSTEMS APPLICATION, PROCEEDINGS, 2000, : 214 - 218
  • [4] Intelligent control for holonic manufacturing systems
    Balasubramanian, S
    Zhang, X
    Norrie, DH
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2000, 214 (10) : 953 - 961
  • [5] An architecture for metamorphic control of holonic manufacturing systems
    Balasubramanian, S
    Brennan, RW
    Norrie, DH
    [J]. COMPUTERS IN INDUSTRY, 2001, 46 (01) : 13 - 31
  • [6] Distributed deadline control in holonic manufacturing systems
    Fletcher, M
    Brennan, RW
    Norrie, DH
    [J]. MULTI-AGENT SYSTEMS AND APPLICATIONS II, 2002, 2322 : 351 - 362
  • [7] Holonic manufacturing systems
    Hopf, M
    Schaeffer, CF
    [J]. INFORMATION INFRASTRUCTURE SYSTEMS FOR MANUFACTURING, 1997, : 431 - 438
  • [8] Holonic manufacturing systems
    Valckenaers, P
    VanBrussel, H
    Bongaerts, L
    Wyns, J
    [J]. INTEGRATED COMPUTER-AIDED ENGINEERING, 1997, 4 (03) : 191 - 201
  • [9] Scheduling and Control of Flexible Manufacturing Systems: a Holonic Approach
    Arauzo, J. A.
    del-Olmo-Martinez, R.
    Lavios, J. J.
    de-Benito-Martin, J. J.
    [J]. REVISTA IBEROAMERICANA DE AUTOMATICA E INFORMATICA INDUSTRIAL, 2015, 12 (01): : 58 - 68
  • [10] Holonic manufacturing control systems: Architecture and methodology.
    Valckenaers, P
    Van Brussel, H
    Bongaerts, L
    Wyns, J
    Peeters, P
    [J]. INTELLIGENT MANUFACTURING SYSTEMS 1998 (IMS'98), 1999, : 55 - 60