Contractors' perceptions of the effects of cash flow on construction projects

被引:28
|
作者
Omopariola, Emmanuel Dele [1 ]
Windapo, Abimbola [2 ]
Edwards, David John [3 ,4 ]
Thwala, Wellington Didibhuku [5 ]
机构
[1] Univ Cape Town, Fac Engn & Built Environm, Rondebosch, South Africa
[2] Univ Cape Town, Dept Construct Econ & Management, Cape Town, South Africa
[3] Birmingham City Univ, Sch Engn & Built Environm, Birmingham, W Midlands, England
[4] Univ Johannesburg, Johannesburg, South Africa
[5] Univ Johannesburg, Dept Construct Management & Quant Surveying, Johannesburg, South Africa
关键词
Cash flow; Construction industry; Construction projects; Contractors; Project management; SENSITIVITY; INVESTMENT; DELAY; MODEL; COST;
D O I
10.1108/JEDT-04-2019-0099
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This paper aims to evaluate Nigerian contractors' perceptions regarding the effects of positive and negative cash flow during construction projects, with a view to establishing effective strategies for cash flow management. Design/methodology/approach A desktop-based literature review is used to develop a cross-sectional questionnaire survey which uses Likert items to elicit responses from construction professionals on: the reasons for cash flow problems; the impacts of negative and positive cash flow; and the potential solutions for improving cash flow on construction projects. Findings The study finds that delay in payments, difficulty in obtaining financial aid and inadequate budgetary control are the causes of cash flow problems during construction projects. Cumulatively, these issues result in project delays, reduced profit margins and in the worst scenarios, abandoned projects. Originality/value There has been limited research into the effects of positive and negative cash flows on construction projects in Nigeria and indeed, the wider geographical location of West Africa. This study addresses this observed dearth and consequently advances methods and solutions to deal with the problem of poor cash flow management in the Nigerian construction industry.
引用
收藏
页码:308 / 325
页数:18
相关论文
共 50 条
  • [1] Cash flow modeling for construction projects
    Zayed, Tarek
    Liu, Yaqiong
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (02) : 170 - +
  • [2] Dynamic management of construction projects' cash flow
    Lu Di
    Wang Yaowu
    Chen Jihu
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 472 - 475
  • [3] An evaluation of contractors' satisfaction with payment terms influencing construction cash flow
    Odeyinka, Henry
    Kaka, Ammar
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2005, 10 (03) : 171 - +
  • [4] Cash Flow Management of Construction Projects in Saudi Arabia
    Shash, Ali A.
    Al Qarra, Abdulaziz
    [J]. PROJECT MANAGEMENT JOURNAL, 2018, 49 (05) : 48 - 63
  • [5] OPTIMUM CASH-FLOW SCHEDULING OF CONSTRUCTION PROJECTS
    EASA, SM
    [J]. CIVIL ENGINEERING SYSTEMS, 1992, 9 (01): : 69 - 85
  • [6] Application of Fuzzy Modelling to Predict Construction Projects Cash Flow
    Tabei, Sayed Mohammad Amin
    Bagherpour, Morteza
    Mahmoudi, Amin
    [J]. PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2019, 63 (02): : 647 - 659
  • [7] Modelling of Project Cash Flow on Construction Projects in Malang City
    Djatmiko, Bambang
    [J]. GREEN CONSTRUCTION AND ENGINEERING EDUCATION FOR SUSTAINABLE FUTURE, 2017, 1887
  • [8] Multi-Criteria Cash Flow Analysis in Construction Projects
    Purnus, Augustin
    Bodea, Constanta-Nicoleta
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 98 - 105
  • [9] Risk-integrated cash flow forecasting for overseas construction projects
    Seung Heon Han
    Hyung Keun Park
    Sang Min Yeom
    Myung Jin Chae
    Du Yon Kim
    [J]. KSCE Journal of Civil Engineering, 2014, 18 : 875 - 886
  • [10] Risk-integrated cash flow forecasting for overseas construction projects
    Han, Seung Heon
    Park, Hyung Keun
    Yeom, Sang Min
    Chae, Myung Jin
    Kim, Du Yon
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (04) : 875 - 886