共 50 条
- [2] Analysis of reinforced concrete culvert considering concrete creep and shrinkage [J]. Transportation Research Record, 1996, (1541): : 120 - 126
- [5] TIME-DEPENDENT ANALYSIS AND CABLE STRETCHING FORCE OPTIMIZATION OF CONCRETE CABLE-STAYED BRIDGES [J]. CORAN 2011: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN NONLINEAR MODELS - STRUCTURAL CONCRETE APPLICATIONS, 2011, : 355 - 368
- [9] Time-dependent reliability analysis of deteriorating reinforced concrete bridges considering nonstationary processes [J]. Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2022, 44 (07): : 1265 - 1273