Component-based Reconstruction Prediction of Runoff at Multi-time Scales in the Source Area of the Yellow River Based on the ARMA Model

被引:0
|
作者
Zhang, Jinping [1 ,2 ]
Xiao, Honglin [1 ]
Fang, Hongyuan [1 ]
机构
[1] Zhengzhou Univ, Sch Water Conservancy Engn, 100 Sci Rd, Zhengzhou 450001, Henan, Peoples R China
[2] Zhengzhou Univ, Yellow River Inst Ecol Protect & Reg Coordinated, Zhengzhou 450001, Henan, Peoples R China
关键词
Runoff; CEEMDAN method; ARMA model; Multi-time scales; Component-based reconstruction prediction; CLIMATE-CHANGE IMPACT; WAVELET ANALYSIS; HYBRID MODEL; DECOMPOSITION;
D O I
10.1007/s11269-021-03035-7
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Improving the accuracy of hydrological prediction for long-term annual runoff series is important for water resources management and planning. In this study, the complementary ensemble empirical mode decomposition with adaptive noise (CEEMDAN) is used to decompose the runoff time series of the Tangnaihai hydrological station in the source area of the Yellow River (SAYR) from 1960 to 2017. The component reconstructions are evaluated with the Nash-Sutcliffe efficiency (NSE) coefficient, and the autoregressive moving average (ARMA) model is used to simulate and predict the runoff components at multi-time scales, which are also evaluated with the NSE coefficient. The results show that the NSE coefficient of the component simulations and predictions by ARMA are relatively high. Moreover, the NSE coefficients increase in step with the fluctuation period of the runoff component. For the runoff component-based reconstruction models at multi-time scales, the mean relative errors of simulation and prediction are low at 8.25% and 8.78%, respectively. In addition, the high-frequency components play an important role in the modal reconstruction as well as the simulation and prediction. Thus, focusing on the high-frequency components can improve the overall accuracy of runoff prediction based on the ARMA model at multi-time scales.
引用
收藏
页码:433 / 448
页数:16
相关论文
共 50 条
  • [1] Component-based Reconstruction Prediction of Runoff at Multi-time Scales in the Source Area of the Yellow River Based on the ARMA Model
    Jinping Zhang
    Honglin Xiao
    Hongyuan Fang
    [J]. Water Resources Management, 2022, 36 : 433 - 448
  • [2] Uncertainty analysis and prediction of river runoff with multi-time scales
    Zhang, Jinping
    Zhao, Yong
    Lin, Xiaomin
    [J]. WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2017, 17 (03): : 897 - 906
  • [3] Multi-time scale co-integration forecast of annual runoff in the source area of the Yellow River
    Zhang, Jinping
    Li, Hongbin
    Su, Bin
    Fang, Hongyuan
    [J]. JOURNAL OF WATER AND CLIMATE CHANGE, 2021, 12 (01) : 101 - 115
  • [4] Runoff simulation of Tangnaihai hydrological station in source area of Yellow River based on SWAT model
    Li, K.
    Wang, Y. Q.
    Xu, J. J.
    Hong, X. F.
    Feng, Y.
    [J]. 6TH INTERNATIONAL CONFERENCE ON WATER RESOURCE AND ENVIRONMENT, 2020, 612
  • [5] Study on the periodic fluctuations of runoff with multi-time scales based on set pair analysis
    Ye, Yan
    Zhang, Jinping
    Yang, Jiachun
    Li, Jian
    [J]. DESALINATION AND WATER TREATMENT, 2018, 129 : 332 - 336
  • [6] Annual runoff prediction in the source area of the Yellow River based on structure change co-integration theory
    Zhang, Jinping
    Li, Hongbin
    Sun, Bin
    Fang, Hongyuan
    [J]. WATER SUPPLY, 2020, 20 (05) : 1664 - 1677
  • [7] Impact of reservoir operation on runoff and sediment load at multi-time scales based on entropy theory
    Zhang, Jinping
    Xiao, Honglin
    Zhang, Xin
    Li, Fawen
    [J]. JOURNAL OF HYDROLOGY, 2019, 569 : 809 - 815
  • [8] Water quality prediction in the Yellow River source area based on the DeepTCN-GRU model
    Tian, Qingqing
    Luo, Wei
    Guo, Lei
    [J]. JOURNAL OF WATER PROCESS ENGINEERING, 2024, 59
  • [9] Application of the Xin' an River Model Combining with Snowmelt Runoff Model in the Source Area of the Yellow River
    Li Liqin
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL VI, 2007, : 296 - 300
  • [10] Parallel multi-objective calibration of a component-based river temperature model
    Buahin, Caleb A.
    Horsburgh, Jeffery S.
    Neilson, Bethany T.
    [J]. ENVIRONMENTAL MODELLING & SOFTWARE, 2019, 116 : 57 - 71