Lot sizing with quality improvement and setup time reduction

被引:11
|
作者
Vörös, J [1 ]
机构
[1] Janus Pannonius Univ, Fac Business & Econ, H-7622 Pecs, Hungary
关键词
Economic Order Quantity; Just-in-Time; Total Quality Management;
D O I
10.1016/S0377-2217(97)00447-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we develop a model that considers process quality improvement and setup cost reduction. The distinctive characteristics of our model are embodied in the assumptions that production rate is finite and cost of attaining close to zero setup time is not infinite. Additionally, the process layout makes possible spotting problems at the place of appearance and these problems can be fixed. The outcome of our analysis under these assumptions supports the popular operations paradigm that reducing response time and increasing process reliability are parallel processes. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:568 / 574
页数:7
相关论文
共 50 条