A simulated annealing approach for multi-manned assembly line balancing problem type II

被引:15
|
作者
Roshani, Abdolreza [1 ]
Giglio, Davide [1 ]
机构
[1] Univ Genoa, Dept Informat Bioengn Robot & Syst Engn, Via Opera Pia 13, I-16145 Genoa, Italy
来源
IFAC PAPERSONLINE | 2015年 / 48卷 / 03期
关键词
Assembly Line Balancing problem; Multi-manned workstations; Cycle time; Simulated annealing; ALGORITHM;
D O I
10.1016/j.ifacol.2015.06.430
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Multi-manned assembly lines are often designed to produce large-sized products, such as automobiles, trucks and buses. In this type of production lines, usually there are multi To manned workstations where a group of workers simultaneously performs different, operations On the Same individual product. One of the problems, that managers of such production lines usually encounter, is to produce the optimal number of items using a fixed number of workstations, without adding new ones in order to meet the market, demand. In this paper, such a class of assembly line balancing problems, named multi-manned assembly line balancing problems type II, has been addressed. Since the problem is NP-hard, a meta-heuristic approach based On a simulated annealing algorithm has been developed to solve the problem. The performance of the proposed algorithm has been tested On a set of test problems taken from the literature; the results show that the algorithm performs well. (C) 2015, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:2299 / 2304
页数:6
相关论文
共 50 条
  • [1] A simulated annealing algorithm for multi-manned assembly line balancing problem
    Roshani, Abdolreza
    Roshani, Arezoo
    Roshani, Abdolhassan
    Salehi, Mohsen
    Esfandyari, Azadeh
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 238 - 247
  • [2] Mixed-model multi-manned assembly line balancing problem: a mathematical model and a simulated annealing approach
    Roshani, Abdolreza
    Nezami, Farnaz Ghazi
    ASSEMBLY AUTOMATION, 2017, 37 (01) : 34 - 50
  • [3] Simulated annealing algorithms for the multi-manned assembly line balancing problem: minimising cycle time
    Roshani, Abdolreza
    Giglio, Davide
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (10) : 2731 - 2751
  • [4] The multi-manned joint assembly line balancing and feeding problem
    Zangaro, Francesco
    Minner, Stefan
    Battini, Daria
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (16) : 5543 - 5565
  • [5] A multi-manned assembly line balancing problem with classified teams: a new approach
    Yilmaz, Hamid
    Yilmaz, Mustafa
    ASSEMBLY AUTOMATION, 2016, 36 (01) : 51 - 59
  • [6] Multi-Manned Assembly Line Balancing: Workforce Synchronization for Big Data Sets through Simulated Annealing
    Pilati, Francesco
    Ferrari, Emilio
    Gamberi, Mauro
    Margelli, Silvia
    APPLIED SCIENCES-BASEL, 2021, 11 (06):
  • [7] Multi-manned assembly line balancing problem with balanced load density
    Yilmaz, Hamid
    Yilmaz, Mustafa
    ASSEMBLY AUTOMATION, 2015, 35 (01) : 137 - 142
  • [8] Constraint programming model for multi-manned assembly line balancing problem
    Cil, Zeynel Abidin
    Kizilay, Damla
    COMPUTERS & OPERATIONS RESEARCH, 2020, 124
  • [9] A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time
    Yang, Wucheng
    Cheng, Wenming
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [10] A Multi-Manned Assembly Line Worker Assignment and Balancing Problem With Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Lee, Sang Hyun
    Lee, Seung Gi
    Kim, Hyung Rok
    Kim, Hyun-Jung
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (03) : 7786 - 7793