An Empirical Investigation of Key Pre-project Planning Practices Affecting the Cost Performance of Green Building Projects

被引:10
|
作者
Son, H. [1 ]
Lee, S. [2 ]
Kim, C. [1 ]
机构
[1] Chung Ang Univ, Dept Architectural Engn, 84 Heukseok Ro, Seoul, South Korea
[2] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ USA
关键词
cost performance; critical factors; green building project; PDRI; pre-project planning; SVM-RFE; GENE SELECTION;
D O I
10.1016/j.proeng.2015.08.401
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry has been increasingly adopting green building because of its advantages over conventional building. However, implementing successful green building projects entails difficulties in terms of cost performance. The objective of this study is to identify the critical factors that affect the cost performance of green building projects during their pre-project planning phase. This study validates the relationship between certain critical factors and the cost performance of green building projects. Support vector machine-recursive feature elimination (SVM-RFE), a data mining-based feature selection method, is applied to a data set comprising 53 green building projects. The results of the study show that 10 out of 64 project definition rating index (PDRI) factors exert most of the influence on the cost performance of the green building projects. These results will help the project stakeholders deliver green building projects more successfully in terms of cost performance. (C) 2015 Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license.
引用
收藏
页码:37 / 41
页数:5
相关论文
共 29 条
  • [1] An investigation into pre-project planning challenges on public building projects in Zambia
    Tembo, Chipozya K.
    Muleya, Franco
    Kalumbi, Pretty
    [J]. BUILDING SMART, RESILIENT AND SUSTAINABLE INFRASTRUCTURE IN DEVELOPING COUNTRIES, DII-2022, 2023, : 43 - 51
  • [2] Pre-project Planning Process Study of Green Building Construction Projects in Thailand
    Khun-anod, Kritsada
    Limsawasd, Charinee
    [J]. ENGINEERING JOURNAL-THAILAND, 2019, 23 (06): : 67 - 81
  • [3] Early prediction of the performance of green building projects using pre-project planning variables: data mining approaches
    Son, Hyojoo
    Kim, Changwan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2015, 109 : 144 - 151
  • [4] LEED-PDRI FRAMEWORK FOR PRE-PROJECT PLANNING OF SUSTAINABLE BUILDING PROJECTS
    Weerasinghe, Gamini
    Soundararajan, Karthik
    Ruwanpura, Janaka
    [J]. JOURNAL OF GREEN BUILDING, 2007, 2 (03): : 123 - 143
  • [5] Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables
    Son, Hyojoo
    Kim, Changmin
    Kim, Changwan
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 27 : 60 - 66
  • [6] Eco-City Projects: Incorporating Sustainability Requirements during Pre-Project Planning
    Mneimneh, Farah
    Srour, Issam
    Kaysi, Isam
    Harb, Mona
    [J]. JOURNAL OF URBAN TECHNOLOGY, 2017, 24 (01) : 47 - 74
  • [7] Lean project planning and control: empirical investigation of ETO projects
    Junge, Gabriele Hofinger
    Alfnes, Erlend
    Kjersem, Kristina
    Andersen, Bjorn
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 12 (04) : 1120 - 1145
  • [8] Identifying key performance indicators for use in control of pre-project stage process in construction
    Haponava, Tatsiana
    Al-Jibouri, Saad
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2009, 58 (02) : 160 - 173
  • [9] Pre-project facility and layout planning for setting up cost effective wafer bumping processes
    Wu, M
    Jin, YG
    Quek, ST
    Huang, S
    [J]. IEEE/CPMT/SEMI(R) 28TH INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 2003, : 351 - 356
  • [10] Management Key Practices for Improving Green Building Performance
    Aghili, Nasim
    Bin Mohammed, Abdul Hakim
    Sheau-Ting, Low
    [J]. ADVANCED SCIENCE LETTERS, 2017, 23 (09) : 8874 - 8876