SST-1 Status and Plans

被引:21
|
作者
Pradhan, Subrata [1 ]
Sharma, Aashoo N. [1 ]
Tanna, Vipul L. [1 ]
Khan, Ziauddin [1 ]
Prasad, Upendra [1 ]
Doshi, Kalpesh [1 ]
Raval, Dilip C. [1 ]
Pathan, Firozkhan [1 ]
Gupta, Naresh C. [1 ]
Tank, Jignesh [1 ]
Gupta, Manoj K. [1 ]
Santra, Prosenjit [1 ]
Biswas, Prabal [1 ]
Parekh, Tejas [1 ]
Masand, Harish [1 ]
Sharma, Dinesh [1 ]
Srivastava, Amit [1 ]
Patel, Hitesh [1 ]
机构
[1] Inst Plasma Res, Gandhinagar 382428, India
关键词
Baking; bubble shields; leak-tight sub-nano-ohm dc joint resistance and first plasma; Steady State Superconducting Tokamak (SST-1); supercritical helium;
D O I
10.1109/TPS.2011.2179678
中图分类号
O35 [流体力学]; O53 [等离子体物理学];
学科分类号
070204 ; 080103 ; 080704 ;
摘要
The Steady State Superconducting Tokamak (SST-1) is currently being refurbished in a mission mode at the Institute for Plasma Research with an ultimate objective of producing the first plasma in early 2012. Since January 2009, under the SST-1 Mission mandate, a broad spectrum of refurbishment activities have been initiated and pursued on several subsystems of SST-1. Developing sub-nano-ohm leak-tight joints in the magnet winding packs, developing single-phased LN2-cooled thermal shields, developing supercritical-helium-cooled 5-K thermal shields for magnet cases, ensuring thermal and electrical isolations between various subsystems of SST-1, testing of each of the SST-1 toroidal field (TF) magnets at 4.5 K with nominal currents, testing each of the modules and octants of the SST-1 machine shell in representative experimentally simulated scenarios, augmentation and reliability establishment of the SST-1 vacuum vessel baking system, time synchronizations among various heterogeneous subsystems of SST-1, large data-storage scenarios, and integrated engineering testing of the first phase of the plasma diagnostics are some of the major refurbishment activities. Presently, the SST-1 device integration is in full swing. The cold test of the assembled SST-1 TF and poloidal field magnets began in December 2011. Following the successful testing of the SST-1 superconducting magnet system and engineering validations of the machine shell, the first plasmas will be attempted in SST-1. The first plasma will be similar to 100-kA limiter assisted with the available volt-seconds and could possibly be assisted by ECCD/LHCD.
引用
收藏
页码:614 / 621
页数:8
相关论文
共 50 条
  • [1] SST-1 Status & Plans
    Pradhan, S.
    Sharma, A. N.
    Tanna, V. L.
    Khan, Ziauddin
    Prasad, U.
    Raval, D. C.
    Khan, Firoz
    Gupta, N. C.
    Tank, J.
    Gupta, M. K.
    Santra, P.
    Biswas, P.
    Masand, H.
    Sharma, D.
    Srivastava, A.
    Patel, H.
    2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2011,
  • [2] Present status of the SST-1 project
    Saxena, YC
    NUCLEAR FUSION, 2000, 40 (06) : 1069 - 1082
  • [3] Upgradation plans of SST-1 Cryogenics system at IPR
    Tanna, V. L.
    Pradhan, S.
    10TH ASIA PLASMA AND FUSION ASSOCIATION CONFERENCE (APFA), 2017, 823
  • [4] SST-1: An overview
    Deshpande, SP
    17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 227 - 232
  • [5] Operation of SST-1 TF power supply during SST-1 campaigns
    Sharma, Dinesh Kumar
    Vora, Murtuza M.
    Ojha, Amit
    Singh, Akhilesh Kumar
    Bhavsar, Chirag
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1153 - 1157
  • [6] Instrumentation for status monitoring and protection of SST-1 superconducting magnets
    Sharma, A. N.
    Prasad, U.
    Doshi, K.
    Varmora, P.
    Khristi, Y.
    Patel, D.
    Pradhan, S.
    FUSION ENGINEERING AND DESIGN, 2016, 112 : 771 - 777
  • [7] The first experiments in SST-1
    Pradhan, S.
    Khan, Z.
    Tanna, V. L.
    Sharma, A. N.
    Doshi, K. J.
    Prasad, U.
    Masand, H.
    Kumar, Aveg
    Patel, K. B.
    Bhandarkar, M. K.
    Dhongde, J. R.
    Shukla, B. K.
    Mansuri, I. A.
    Varadarajulu, A.
    Khristi, Y. S.
    Biswas, P.
    Gupta, C. N.
    Sharma, D. K.
    Raval, D. C.
    Srinivasan, R.
    Pandya, S. P.
    Atrey, P. K.
    Sharma, P. K.
    Patel, P. J.
    Patel, H. S.
    Santra, P.
    Parekh, T. J.
    Dhanani, K. R.
    Paravastu, Y.
    Pathan, F. S.
    Chauhan, P. K.
    Khan, M. S.
    Tank, J. K.
    Panchal, P. N.
    Panchal, R. N.
    Patel, R. J.
    George, S.
    Semwal, P.
    Gupta, P.
    Mahesuriya, G. I.
    Sonara, D. P.
    Jayswal, S. P.
    Sharma, M.
    Patel, J. C.
    Varmora, P. P.
    Patel, D. J.
    Srikanth, G. L. N.
    Christian, D. R.
    Garg, A.
    Bairagi, N.
    NUCLEAR FUSION, 2015, 55 (10)
  • [8] SST-1 Refurbishment Progress: an Update
    Pradhan, Subrata
    PLASMA SCIENCE & TECHNOLOGY, 2013, 15 (02) : 137 - 141
  • [9] Design of magnetic diagnostics for SST-1
    Raju, D
    Joseph, BK
    Mattoo, SK
    FUSION ENGINEERING AND DESIGN, 1997, 34-35 : 717 - 720
  • [10] SST-1 Refurbishment Progress: an Update
    Subrata PRADHAN
    SST Mission Team
    Plasma Science and Technology, 2013, 15 (02) : 137 - 141