A stochastic production planning problem with nonlinear cost

被引:25
|
作者
Tang, Lixin [1 ]
Che, Ping [1 ,2 ]
Liu, Jiyin [1 ,3 ]
机构
[1] Northeastern Univ, Logist Inst, Liaoning Key Lab Mfg Syst & Logist, Shenyang 110004, Peoples R China
[2] Northeastern Univ, Dept Math, Shenyang 110004, Peoples R China
[3] Univ Loughborough, Sch Business, Loughborough LE11 3TU, Leics, England
基金
中国国家自然科学基金;
关键词
Stochastic production planning; Inventory; Scenario-based approach; Stepwise Lagrangian relaxation; Variable splitting; MINLP; GENERALIZED ASSIGNMENT PROBLEM; LOT-SIZING PROBLEMS; OPTIMIZATION; UNCERTAINTY; DEMAND; DECOMPOSITION; HEURISTICS; ALGORITHMS; CAPACITY; MODELS;
D O I
10.1016/j.cor.2011.09.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Most production planning models are deterministic and often assume a linear relation between production volume and production cost. In this paper, we investigate a production planning problem in a steel production process considering the energy consumption cost which is a nonlinear function of the production quantity. Due to the uncertain environment, the production demands are stochastic. Taking a scenario-based approach to express the stochastic demands according to the knowledge of planners on the demand distributions, we formulate the stochastic production planning problem as a mixed integer nonlinear programming (MINLP) model. Approximated with the piecewise linear functions, the MINLP model is transformed into a mixed integer linear programming model. The approximation error can be improved by adjusting the linearization ranges repeatedly. Based on the piecewise linearization, a stepwise Lagrangian relaxation (SLR) heuristic for the problem is proposed where variable splitting is introduced during Lagrangian relaxation (LR). After decomposition, one subproblem is solved by linear programming and the other is solved by an effective polynomial time algorithm. The SLR heuristic is tested on a large set of problem instances and the results show that the algorithm generates solutions very close to optimums in an acceptable time. The impact of demand uncertainty on the solution is studied by a computational discussion on scenario generation. (C) 2011 Published by Elsevier Ltd.
引用
收藏
页码:1977 / 1987
页数:11
相关论文
共 50 条
  • [1] A STOCHASTIC PRODUCTION PLANNING PROBLEM
    Canepa, E. C.
    Covei, D-P
    Pirvu, T. A.
    [J]. FIXED POINT THEORY, 2022, 23 (01): : 179 - 198
  • [2] On solving stochastic production planning problem
    Meybodi, MZ
    [J]. DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 902 - 904
  • [3] ON THE STOCHASTIC NONSEQUENTIAL PRODUCTION-PLANNING PROBLEM
    RAO, S
    SCHNELLER, GO
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1990, 41 (03) : 241 - 247
  • [4] A SUBOPTIMAL POLICY FOR STOCHASTIC PRODUCTION PLANNING PROBLEM
    SILVA, OS
    CARVALHO, MFH
    HENRIQUE, MM
    [J]. PRODUCTION MANAGEMENT METHODS, 1994, 19 : 297 - 303
  • [5] Minimum average cost production planning in stochastic manufacturing systems
    Sethi, SP
    Zhang, HQ
    Zhang, Q
    [J]. MATHEMATICAL MODELS & METHODS IN APPLIED SCIENCES, 1998, 8 (07): : 1251 - 1276
  • [6] Stochastic production planning problem under unobserved inventory system
    Silva Filho, Oscar S.
    [J]. 2007 AMERICAN CONTROL CONFERENCE, VOLS 1-13, 2007, : 531 - 536
  • [7] AN OPTIMAL STOCHASTIC PRODUCTION PLANNING PROBLEM WITH RANDOMLY FLUCTUATING DEMAND
    FLEMING, WH
    SETHI, SP
    SONER, HM
    [J]. SIAM JOURNAL ON CONTROL AND OPTIMIZATION, 1987, 25 (06) : 1494 - 1502
  • [8] A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning
    Chang Fang
    Xinbao Liu
    Panos M. Pardalos
    Jianyu Long
    Jun Pei
    Chao Zuo
    [J]. Journal of Global Optimization, 2017, 68 : 851 - 878
  • [9] A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning
    Fang, Chang
    Liu, Xinbao
    Pardalos, Panos M.
    Long, Jianyu
    Pei, Jun
    Zuo, Chao
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2017, 68 (04) : 851 - 878
  • [10] A concave-cost production planning problem with remanufacturing options
    Yang, J
    Golany, B
    Yu, G
    [J]. NAVAL RESEARCH LOGISTICS, 2005, 52 (05) : 443 - 458