Optimal solution techniques to alternative vendor-buyer models in two-stage supply chains with a stochastic lead time for delivering batches of a lot

被引:0
|
作者
Hoque, Md Abdul [1 ]
机构
[1] Brac Univ, Brac Business Sch, Dhaka, Bangladesh
关键词
Inventory; lead time; exponential distribution; minimal total cost solution; INTEGRATED INVENTORY MODEL; SYSTEM; POLICY;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Vendor-buyer models have been developed assuming a stochastic lead time for delivering equal-sized batches (sub-lots) of a lot and backordering of shortages. The expected total costs for both the vendor and the buyer are minimized independently, as well as for the integrated system. The significant cost-reduction by the latter method is illustrated. However, these models appear to have some loopholes. First we demonstrate the loopholes and then develop alternative models considering lead time as a random variable while accounting for the loopholes. This follows the development of optimal solution techniques to the alternative models. Then we undertake comparative studies of our methods with the earlier ones on solutions to numerical problems. This comparison highlights the potential significance of the current method. Finally, the limitations of this study and the scope of future research are discussed.
引用
下载
收藏
页码:254 / 259
页数:6
相关论文
共 11 条
  • [1] Developing a coordinated vendor-buyer model in two-stage supply chains with stochastic lead-times
    Sajadieh, Mohsen S.
    Jokar, Mohammad R. Akbari
    Modarres, Mohammad
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (08) : 2484 - 2489
  • [2] Lost-sales reduction on coordinated vendor-buyer models of a two-stage supply chain with stochastic supply lead-Time
    Lin H.-J.
    Lin, Hsien-Jen (au4409@mail.au.edu.tw), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (26): : 549 - 566
  • [3] A vendor-buyer stochastic inventory model with lead time reduction in supply chain
    Song, Hua-Ming
    Ming, Shi-Hua
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2542 - +
  • [4] Integrated vendor-buyer cooperative models with Stochastic demand in controllable lead time
    Ouyang, LY
    Wu, KS
    Ho, CH
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 92 (03) : 255 - 266
  • [5] An integrated vendor-buyer cooperative model under stochastic supply lead-time
    Sajadieh, Mohsen Sheikh
    Jokar, Mohammad Reza Akbari
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (9-10): : 1043 - 1050
  • [6] Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time
    Lin, Hsien-Jen
    COMPUTERS & OPERATIONS RESEARCH, 2016, 72 : 43 - 49
  • [7] An alternative model for integrated vendor-buyer inventory under controllable lead time and its heuristic solution
    Hoque, M. A.
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2007, 38 (06) : 501 - 509
  • [8] Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem
    Kovacs, Andras
    Egri, Peter
    Kis, Tamas
    Vancza, Jozsef
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (02) : 385 - 394
  • [9] Two-stage stochastic program for disassembly lot-sizing under random ordering lead time
    Slama, Ilhem
    Ben-Ammar, Oussama
    Garcia, David
    Dolgui, Alexandre
    IFAC PAPERSONLINE, 2022, 55 (10): : 1363 - 1368
  • [10] A two-stage stochastic programming approach for identifying optimal postponement strategies in supply chains with uncertain demand
    Weskamp, Christoph
    Koberstein, Achim
    Schwartz, Frank
    Suhl, Leena
    Voss, Stefan
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2019, 83 : 123 - 138