Thames water's Victorian mains replacement programme

被引:0
|
作者
不详
机构
来源
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:15 / 15
页数:1
相关论文
共 50 条
  • [1] InfoNet speeds Thames Water Distribution Mains replacement program
    不详
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2008, 100 (10): : 22 - 22
  • [2] REPLACEMENT RULES FOR WATER MAINS
    WALSKI, TM
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1987, 79 (11): : 33 - 37
  • [3] REPLACEMENT OF WATER DISTRIBUTION MAINS
    不详
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1969, 61 (09): : 417 - &
  • [4] Thames water ring main: prolonging the life of trunk mains
    Anon
    Pipes and Pipelines International, 1994, 39 (06): : 5 - 8
  • [5] Folded pipe insertion trials - UK mains replacement programme
    不详
    INTERNATIONAL GAS ENGINEERING AND MANAGEMENT, 2002, 42 (04): : 10 - 11
  • [6] A mains replacement strategy - selecting the right mains for replacement
    McAll, RK
    Hamling, D
    AGEING PIPELINES: OPTIMIZING THE MANAGEMENT AND OPERATION: LOW-PRESSURE - HIGH-PRESSURE, 1999, 1999 (08): : 281 - 291
  • [7] Rehabilitation of High Consequence Water Mains In Lieu of Replacement
    Matthews, John C.
    Donnally, Susan
    PIPELINES 2016 - OUT OF SIGHT, OUT OF MIND, NOT OUT OF RISK, 2016, : 1781 - 1788
  • [8] An Optimal Maintenance and Replacement Strategy for Deteriorating Water Mains
    Lin, Peiyuan
    Chen, Xianying
    Huang, Sheng
    Ma, Baosong
    WATER, 2022, 14 (13)
  • [9] A prioritization method for replacement of water mains using rank aggregation
    Choi, Go Bong
    Kim, Jong Woo
    Suh, Jung Chul
    Jang, Kwang Ho
    Lee, Jong Min
    KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2017, 34 (10) : 2584 - 2590
  • [10] A prioritization method for replacement of water mains using rank aggregation
    Go Bong Choi
    Jong Woo Kim
    Jung Chul Suh
    Kwang Ho Jang
    Jong Min Lee
    Korean Journal of Chemical Engineering, 2017, 34 : 2584 - 2590