A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem

被引:87
|
作者
Ozcan, Ugur [1 ]
Kellegoz, Talip [2 ]
Toklu, Bilal [3 ]
机构
[1] Selcuk Univ, Dept Ind Engn, TR-42075 Selcuklu, Konya, Turkey
[2] Kirikkale Univ, Dept Ind Engn, TR-71450 Yahsihan, Kirikkale, Turkey
[3] Gazi Univ, Dept Ind Engn, TR-06570 Ankara, Turkey
关键词
assembly line balancing; U-lines; mixed-model production; stochastic; genetic algorithms; SHAPED PRODUCTION LINES; ASSEMBLY LINES; EVOLUTIONARY ALGORITHM; SYSTEMS; DESIGN; TIMES;
D O I
10.1080/00207541003690090
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Mixed-model assembly lines are widely used to improve the flexibility to adapt to the changes in market demand, and U-lines have become popular in recent years as an important component of just-in-time production systems. As a consequence of adaptation of just-in-time production principles into the manufacturing environment, mixed-model production is performed on U-lines. This type of a production line is called a mixed-model U-line. In mixed-model U-lines, there are two interrelated problems called line balancing and model sequencing. In real life applications, especially in manual assembly lines, the tasks may have varying execution times defined as a probability distribution. In this paper, the mixed-model U-line balancing and sequencing problem with stochastic task times is considered. For this purpose, a genetic algorithm is developed to solve the problem. To assess the effectiveness of the proposed algorithm, a computational study is conducted for both deterministic and stochastic versions of the problem.
引用
收藏
页码:1605 / 1626
页数:22
相关论文
共 50 条
  • [1] A genetic algorithm for the balancing and sequencing problem in the mixed-model U-line
    Zhan, Yang
    Zhang, Rui
    [J]. PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN PRODUCTION AND LOGISTICS SYSTEMS (CIPLS), 2013, : 123 - 130
  • [2] A Genetic Algorithm for the Mixed-Model U-Line Balancing Problem
    Dong, Hai
    Cao, Jianhua
    Zhao, Weiling
    [J]. MANUFACTURING PROCESS AND EQUIPMENT, PTS 1-4, 2013, 694-697 : 3391 - +
  • [3] Mixed-model U-line balancing problem
    Univ of Guelph, Guelph, Canada
    [J]. Int J Prod Res, 2 (485-501):
  • [4] The mixed-model U-line balancing problem
    Sparling, D
    Miltenburg, J
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (02) : 485 - 501
  • [5] A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem
    Lian, Kunlei
    Zhang, Chaoyong
    Gao, Liang
    Shao, Xinyu
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5117 - 5131
  • [6] A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks
    Industrial Engineering Department, University of Tehran, Tehran, Iran
    [J]. Int J Adv Manuf Technol, 9-12 (1111-1122):
  • [7] A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks
    Kazemi, Seyed Mahmood
    Ghodsi, Reza
    Rabbani, Masoud
    Tavakkoli-Moghaddam, Reza
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (9-12): : 1111 - 1122
  • [8] A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks
    Seyed Mahmood Kazemi
    Reza Ghodsi
    Masoud Rabbani
    Reza Tavakkoli-Moghaddam
    [J]. The International Journal of Advanced Manufacturing Technology, 2011, 55 : 1111 - 1122
  • [9] An empirical comparison of improvement heuristics for the mixed-model U-line balancing problem
    Visich, John K.
    Khumawala, Basheer M.
    Diaz-Saiz, Joaquin
    [J]. International Journal of Manufacturing Technology and Management, 2010, 20 (1-4) : 25 - 45
  • [10] Line balancing and model sequencing to reduce work overload in mixed-model U-line production environments
    Kara, Yakup
    [J]. ENGINEERING OPTIMIZATION, 2008, 40 (07) : 669 - 684