The long journey from standardisation to full automation of a mature 200 mm fab

被引:0
|
作者
Heinrich, Harald [1 ]
Deutschlaender, Arthur [2 ]
机构
[1] Infineon Technol Dresden GmbH Automat, Maintenance & Line Control Factory Automat, Dresden, Germany
[2] Univ Appl Sci Stralsund, Mech Engn & Assembly Technol, Stralsund, Germany
关键词
standardization of processes; interfaces; tools and workflows; automation strategy; manufacturing performance; reduction of material flow variability; layout concepts; robotics; automated lot handling; change management; Industrie4.0; digitalisation;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes our long journey from the first standardization projects to support a fully automated workflow to three complex automation hardware projects and will include the learnings about the change management within a running fab for all departments. In the end you will see a fully automated running 200 mm fab with similar productivity key performance indicators (KPI) as a standard automated 300 mm fab today, except the wafer size. We developed our general "Automation Principles" for all Infineon frontend and backend sites and start training courses for management, engineers and operators.
引用
收藏
页码:353 / 358
页数:6
相关论文
共 6 条
  • [1] The Long Journey From Standardization to Fully Fab Automation and More
    Heinrich, Harald
    Deutschlaender, Arthur
    Zoghlami, Feryel
    Sen, Okan Kamil
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2019, 32 (04) : 408 - 414
  • [2] Factory automation migration experience for foundry Fab from 200mm to 300mm
    Lin, LR
    Chu, HL
    Hung, CH
    Lee, YC
    Yeh, PC
    [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 278 - 281
  • [3] IMPLEMENTATION OF A SIMULATION-BASED SHORT-TERM LOT ARRIVAL FORECAST IN A MATURE 200MM SEMICONDUCTOR FAB
    Scholl, Wolfgang
    Gan, Boon Ping
    Lendermann, Peter
    Noack, Daniel
    Rose, Oliver
    Preuss, Patrick
    Pappert, Falk Stefan
    [J]. PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 1927 - 1938
  • [5] Pursuing the increase of factory automation in 200mm frontend manufacturing to manage the changes imposed by the transition from high-volume low-mix to high-mix low-volume production
    Heinrich, Harald
    Schneider, Germar
    Heinlein, Frank
    Keil, Sophia
    Deutschlaender, Arthur
    Lasch, Rainer
    [J]. 2008 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE, 2008, : 148 - +
  • [6] 6 mm short versus 11 mm long inter-foraminal implants in the full-arch rehabilitation of edentulous non-atrophic mandibles: 5-year results from a multicenter randomized controlled trial
    Guida, Luigi
    Esposito, Umberto
    Sirignano, Massimiliano
    Torrisi, Paolo
    Annunziata, Marco
    Cecchinato, Denis
    [J]. CLINICAL ORAL IMPLANTS RESEARCH, 2023, 34 (02) : 127 - 136