共 6 条
- [2] Factory automation migration experience for foundry Fab from 200mm to 300mm [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 278 - 281
- [3] IMPLEMENTATION OF A SIMULATION-BASED SHORT-TERM LOT ARRIVAL FORECAST IN A MATURE 200MM SEMICONDUCTOR FAB [J]. PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 1927 - 1938
- [5] Pursuing the increase of factory automation in 200mm frontend manufacturing to manage the changes imposed by the transition from high-volume low-mix to high-mix low-volume production [J]. 2008 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE, 2008, : 148 - +