Risks and Hidden Costs: A Study of 26 Outsourced Projects

被引:0
|
作者
Haddad, Maliha [1 ]
机构
[1] George Washington Univ, Washington, DC 20052 USA
来源
关键词
IS outsourcing; risks; hidden costs; outsourced software;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Despite the current unfavorable outlook of the larger economy, there has been a steady increase in information systems outsourcing by organizations which is projected to reach $97.9 billion in 2012. Ordinarily, organizations outsource their software projects to avoid the risks associated with developing the software internally and to control costs. However, a study of twenty six outsourced projects indicates that such organizations face unique risks and hidden costs that are particular to software outsourcing. This paper describes research done to estimate the effort expended by organizations in overseeing and participating in outsourced software projects and the implications for identifying risks and predicting costs of such projects. For many of the organizations that participated in the survey, uncovering the actual costs and risks of an outsourced project was an eye opener: the hidden costs and risks are surprisingly significant and are typically not managed by the organization.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Managing Outsourced IT Projects' Security Risks: A Case Study
    Almutairi, Moneef
    Riddle, Stephen
    [J]. ICIME 2018: PROCEEDINGS OF THE 2018 10TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT AND ENGINEERING, 2018, : 21 - 26
  • [2] A Framework for Managing Security Risks of Outsourced IT Projects: An Empirical Study
    Almutairi, Moneef
    Riddle, Stephen
    [J]. PROCEEDINGS OF 2018 INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND INFORMATION MANAGEMENT (ICSIM 2018) / WORKSHOP 2018 INTERNATIONAL CONFERENCE ON BIG DATA AND SMART COMPUTING (ICBDSC 2018), 2018, : 40 - 44
  • [3] Critical risks in outsourced IT projects: The intractable and the unforeseen
    Taylor, Hazel
    [J]. COMMUNICATIONS OF THE ACM, 2006, 49 (11) : 75 - 79
  • [4] Outsourced IT projects from the vendor perspective: Different goals, different risks
    Taylor, Hazel
    [J]. JOURNAL OF GLOBAL INFORMATION MANAGEMENT, 2007, 15 (02) : 1 - 27
  • [5] Managing outsourced automation projects
    Pageler, EL
    [J]. I&CS-INSTRUMENTATION & CONTROL SYSTEMS, 1996, 69 (05): : 27 - 31
  • [6] The Hidden Costs of Hidden Costs
    Laczniak, Gene
    [J]. JOURNAL OF MACROMARKETING, 2017, 37 (03) : 324 - 327
  • [7] Understanding the impact of risks on performance in internal and outsourced information technology projects: The role of strategic importance
    Liu, Shan
    Wang, Lin
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (08) : 1494 - 1510
  • [8] IMPACTS OF CONSTRUCTION RISKS ON COSTS IN LEED-CERTIFIED PROJECTS
    Gurgun, Asli Pelin
    Arditi, David
    Vilar, Pablo Casals
    [J]. JOURNAL OF GREEN BUILDING, 2016, 11 (04): : 163 - 181
  • [9] Stakeholders and Risks in Liquified Natural Gas Bunkering Projects: The Hidden Link
    Bellos, Evangelos
    Chatzistelios, Georgios
    Deligianni, Angeliki
    Leopoulos, Vrassidas
    [J]. SUSTAINABILITY, 2021, 13 (15)
  • [10] The role of trust in outsourced IS development projects
    Sabherwal, R
    [J]. COMMUNICATIONS OF THE ACM, 1999, 42 (02) : 80 - 86