共 50 条
- [1] OPERATING SPEED MODELS ON TANGENT SECTIONS OF TWO-LANE RURAL ROADS [J]. ROAD AND RAIL INFRASTRUCTURE IV, 2016, : 855 - 860
- [2] Predicting operating speeds on tangent sections of two-lane rural highways [J]. GEOMETRIC DESIGN AND EFFECTS ON TRAFFIC OPERATIONS 2000: HIGHWAY AND FACILITY DESIGN, 2000, (1737): : 50 - 57
- [4] Speed prediction models for trucks on two-lane rural highways [J]. GEOMETRIC DESIGN AND THE EFFECTS ON TRAFFIC OPERATIONS 2001: HIGHWAY OPERATIONS, CAPACITY, AND TRAFFIC CONTROL, 2001, (1751): : 44 - 55
- [6] Operating speed prediction an crest vertical curves of rural two-lane highways in Nebraska [J]. GEOMETRIC DESIGN AND THE EFFECTS ON TRAFFIC OPERATIONS 2001: HIGHWAY OPERATIONS, CAPACITY, AND TRAFFIC CONTROL, 2001, (1751): : 67 - 75
- [7] Operating Speed Models on Horizontal Curves for Two-Lane Highways [J]. International Conference on Transportation Planning and Implementation Methodologies for Developing Countries (11th TPMDC) Selected Proceedings, 2016, 17 : 445 - 451