Improved prototype cryomodule for the CEBAF 12 GeV upgrade

被引:0
|
作者
Daly, EF [1 ]
Campisi, IE [1 ]
Henry, J [1 ]
Hicks, WR [1 ]
Hogan, J [1 ]
Kneisel, P [1 ]
Machie, D [1 ]
Reece, CE [1 ]
Rothgeb, T [1 ]
Sekutowicz, J [1 ]
Smith, K [1 ]
Whitlatch, T [1 ]
Wilson, KM [1 ]
Wiseman, M [1 ]
机构
[1] Thomas Jefferson Natl Accelerator Facil, Newport News, VA 23606 USA
关键词
D O I
暂无
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
In order to provide a higher performance building block cryomodule for the CEBAF 12 GeV upgrade, modifications have been made to the design of the Upgrade Cryomodule. The prototype cryomodule will be completed in 2004 and be installed for operation in CEBAF. Design changes enable the use of higher gradient cavities to achieve greater than 100 MV per cryomodule while not exceeding the budgeted cryogenic load of 300 W during steady-state operation. They also include refinements based on experience gained during the construction of the first generation upgraded cryomodules as well as the prototype cryomodule for the Spallation Neutron Source. Two cavity designs will be used in the prototype, one optimized for E-peak/E-acc ratio, and the other optimized for minimum cryogenic load. The input waveguides, thermal shield and piping have been redesigned to accommodate the higher expected heat loads. The vacuum connections consist of niobiumtitanium flanges, aluminum-magnesium seals and stainless steel clamps to provide reliable UHV sealing. The cavity tuner features one cold motor and two piezoelectric actuators to provide coarse and fine tuning respectively.
引用
收藏
页码:1377 / 1379
页数:3
相关论文
共 50 条
  • [1] Fabrication and testing of the SRF cavities for the CEBAF 12 GeV upgrade prototype cryomodule Renascence
    Reece, CE
    Daly, EF
    Manning, S
    Manus, R
    Morgan, S
    Ozelis, JP
    Turlington, L
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3685 - 3687
  • [2] JEFFERSON LAB 12 GEV CEBAF UPGRADE
    Rode, C. H.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 55A AND 55B, 2010, 1218 : 26 - 33
  • [3] Upgrade Of CEBAF From 6 Gev To 12 Gev: Status
    Harwood, Leigh
    APPLICATION OF ACCELERATORS IN RESEARCH AND INDUSTRY, 2013, 1525 : 595 - 599
  • [4] The JLab 12 GeV energy upgrade of CEBAF for QCD and hadronic physics
    Cardman, Lawrence S.
    Harwood, Leigh
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 1344 - 1348
  • [5] Design of the Trigger Interface and Distribution Board for CEBAF 12 GeV Upgrade
    Gu, J.
    Abbott, D.
    Cuevas, C.
    Dong, H.
    Gyurjyan, V.
    Heyes, G.
    Jastrzembski, E.
    Kaneta, S.
    Nganga, N.
    Moffit, B.
    Raydo, B.
    Timmer, C.
    Wilson, J.
    2012 18TH IEEE-NPSS REAL TIME CONFERENCE (RT), 2012,
  • [6] Testing of the new tuner design for the CEBAF 12 GeV upgrade SRF cavities
    Daly, EF
    Davis, GK
    Hicks, WR
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3667 - 3669
  • [7] Upgrading CEBAF to 12 GeV
    Harwood, L
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 586 - 588
  • [8] Physics plans for CEBAF at 12 GeV
    Mecking, BA
    NUCLEAR PHYSICS A, 2002, 711 : 330C - 335C
  • [9] THE CEBAF SUPERCONDUCTING ACCELERATOR CRYOMODULE
    BIALLAS, G
    BRINDZA, P
    RODE, C
    PHILLIPS, L
    IEEE TRANSACTIONS ON MAGNETICS, 1987, 23 (02) : 615 - 618
  • [10] New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab
    Plawski, T.
    Allison, T.
    Bachimanchi, R.
    Dong, H.
    Hovater, C.
    Musson, J.
    PHOTONICS APPLICATIONS IN ASTRONOMY, COMMUNICATIONS, INDUSTRY, AND HIGH-ENERGY PHYSICS EXPERIMENTS 2008, 2008, 7124