A multivariate exponentially weighted moving average control chart for photovoltaic processess

被引:3
|
作者
Coleman, JL [1 ]
Nickerson, J [1 ]
机构
[1] Univ No Colorado, Greeley, CO 80639 USA
关键词
D O I
10.1109/PVSC.2005.1488374
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Development of a comprehensive process control strategy is known to be significantly beneficial to reducing process variability that ultimately drives up the manufacturing cost of photovoltaic cells. Since the electrical metrics that describe photovoltaic cell performance are inherently multivariate in nature, use of a univariate, or one variable, statistical process control chart can have important limitations. The multivariate exponentially weighted moving average, or MEWMA chart, is applied to the electrical metrics of photovoltaic cells to illustrate the improved sensitivity on process variability this method of control charting offers.
引用
收藏
页码:1281 / 1284
页数:4