An Optimal Schedule for Toll Road Network Construction Based on Greedy Algorithm

被引:0
|
作者
Jaya, Oki Saputra [1 ]
Rustam, Zuherman [1 ]
机构
[1] Univ Indonesia, FMIPA, Dept Math, Depok, Indonesia
关键词
Greedy Algorithm; Optimal Schedule; Road Network; Toll Road Construction; TRANSPORTATION NETWORKS; LINKS; ROBUSTNESS;
D O I
暂无
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
Toll road construction is being intensively conducted by the government, especially in Jabodetabek. This makes the schedule of Jabodetabek toll road construction very urgent to solve due to the demands of the target of the completion of the development and it is feared to disturb the existing road condition. Therefore, we conduct research to determine the optimal schedule in construction of Jabodetabek toll road based on Greedy Algorithm. In this study, two methods are used to compare the result, there is greedy algorithm without the deadline and greedy algorithm with the deadline. The determination of toll roads constructed in advance is based on facts in the field, i.e. based on the order of contract status, financial close, and negotiation. Then for the duration of the construction of a toll road depends on the length of the toll road segment that will be built based on the assumption that the length of the toll road construction per km. Greedy algorithm quickly gets an optimal schedule even if the scale of the road network is large, this is because the greedy algorithm can reduce computational complexity. The problem discussed in this paper is very significant in dealing with the construction of toll road networks in Jabodetabek.
引用
收藏
页码:56 / 61
页数:6
相关论文
共 50 条
  • [1] An Optimal Schedule for Urban Road Network Repair Based on the Greedy Algorithm
    Lu, Guangquan
    Xiong, Ying
    Ding, Chuan
    Wang, Yunpeng
    [J]. PLOS ONE, 2016, 11 (10):
  • [2] Optimal model of multi-class toll rate for toll road in road network
    Liu, Wei-Ming
    Fu, Ling-Feng
    Jiang, Shan
    [J]. Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2008, 36 (02): : 1 - 6
  • [3] Network Comprehensive Optimization for Schedule and Cost in Project Construction Based on PSO Algorithm
    Huang, Yuansheng
    Qiu, Zilong
    Zhang, Weina
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1260 - 1264
  • [4] The construction schedule of medium voltage overhead distribution network is optimized based on neural network algorithm
    Li, Xue
    Yan, Tao
    Tan, Yi
    [J]. EAI Endorsed Transactions on Energy Web, 2023, 10
  • [5] AN OPTIMAL INDEPENDENT SETS BASED GREEDY SPECTRAL DEFRAGMENTATION ALGORITHM IN ELASTIC OPTICAL NETWORK
    Wu, Jiahui
    Zhang, Min
    Wang, Fazong
    Yue, Yanan
    Huang, Shanguo
    [J]. 2014 13TH INTERNATIONAL CONFERENCE ON OPTICAL COMMUNICATIONS AND NETWORKS (ICOCN), 2014,
  • [6] Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm
    Yu, Xiaobing
    Zuo, Hengzhong
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [7] Algorithm of Building Optimal Forest Road Network
    Piskunov, M. V.
    [J]. LESNOY ZHURNAL-FORESTRY JOURNAL, 2011, (03)
  • [8] Optimal local dimming based on an improved greedy algorithm
    Zhang, Tao
    Zeng, Qin
    Zhao, Xin
    [J]. APPLIED INTELLIGENCE, 2020, 50 (12) : 4162 - 4175
  • [9] Optimal local dimming based on an improved greedy algorithm
    Tao Zhang
    Qin Zeng
    Xin Zhao
    [J]. Applied Intelligence, 2020, 50 : 4162 - 4175
  • [10] Optimal toll rate decision model and algorithm for toll collected highway network
    Huang, Yafei
    Liu, Weiming
    Liu, Qiao
    [J]. WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 8764 - +