Generation expansion planning in the competitive environment

被引:0
|
作者
Slochanal, SMR [1 ]
Kannan, S [1 ]
Rengaraj, R [1 ]
机构
[1] Thiagarajar Coll Engn, Dept Elect Engn, Madurai, Tamil Nadu, India
关键词
competitive environment; GENCOs; generation expansion planning; particle swarm optimization and regulatory body;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents the Generation Expansion Planning (GEP) problem in a competitive environment. In the competitive market, each power producing companies are called as GENerating COmpanies (GENCOs) and they compete with each other to maximize their own profits. But the objective of the regulatory body is to stabilize the market through coordination between GENCOs by providing long term market information to GENCOs, which prevents extreme over/under investments in the electricity market. The regulatory body is also responsible for optimal generation capacity, while considering system security, national security (fuel mix ratio), social welfare and reserve margin. In this paper, the GEP problem is solved with a realistic test system comprising of 5-GENCOs. Each player performs self-optimization using Particle Swarm Optimization (PSO) technique, assuming the strategies of other players are fixed. The competitive GEP problem is solved iteratively by self-optimizing (maximizing profit) each GENCO in turn, while satisfying the constraints.
引用
收藏
页码:1546 / 1549
页数:4
相关论文
共 50 条
  • [1] Generation expansion planning by considering wind resource in a competitive environment
    Tian, Chunpeng
    Maleki, Akbar
    Motie, Saeid
    Yavarinasab, Adel
    Afrand, Masoud
    JOURNAL OF THERMAL ANALYSIS AND CALORIMETRY, 2020, 139 (04) : 2847 - 2857
  • [2] Generation expansion planning by considering wind resource in a competitive environment
    Chunpeng Tian
    Akbar Maleki
    Saeid Motie
    Adel Yavarinasab
    Masoud Afrand
    Journal of Thermal Analysis and Calorimetry, 2020, 139 : 2847 - 2857
  • [3] Generation expansion planning in a competitive environment using a genetic algorithm
    Park, JB
    Kim, JH
    Lee, KY
    2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2002, : 1169 - 1172
  • [4] Generation expansion planning by considering energy-efficiency programs in a competitive environment
    Motie, Saeid
    Keynia, Farshid
    Ranjbar, Mohammad Reza
    Maleki, Akbar
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 80 : 109 - 118
  • [5] Generation Expansion Planning in Competitive Electricity Markets
    Pereira, Adelino J. C.
    Saraiva, Joao Tome
    2007 IEEE LAUSANNE POWERTECH, VOLS 1-5, 2007, : 897 - +
  • [6] Composite Generation and Transmission Planning in a Competitive Environment
    Elamin, Ibrahim M.
    Al-Saba, Mohammed T.
    2009 INTERNATIONAL CONFERENCE ON POWER ENGINEERING, ENERGY AND ELECTRICAL DRIVES, 2009, : 107 - +
  • [7] The generation expansion planning of the utility in a deregulated environment
    Lin, WM
    Zhan, TS
    Tsay, MT
    Hung, WC
    PROCEEDINGS OF THE 2004 IEEE INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION, RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1 AND 2, 2004, : 702 - 707
  • [8] A price guideline for Generation Expansion Planning in competitive electricity markets
    Moghaddam, MP
    Sheikh-El-Eslami, MK
    Jadid, S
    2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, : 197 - 201
  • [9] Probabilistic Power Generation Expansion Planning in a Competitive Electricity Market
    Pereira, Adelino J. C.
    Saraiva, Joao Tome
    2008 10TH INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2008, : 125 - +
  • [10] Evaluation of generation expansion investment under competitive market environment
    Su, JF
    Wu, FF
    2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, : 2136 - 2140