Two-Stage Inexact-Probabilistic Programming Model for Water Quality Management

被引:9
|
作者
Li, Yongping [1 ]
Li, Wei [2 ]
Huang, Guohe [1 ]
机构
[1] N China Elect Power Univ, MOE Key Lab Reg Energy Syst Optimizat, SC Resources & Environm Res Acad, Beijing 102206, Peoples R China
[2] Peking Univ, Coll Urban & Environm Sci, Beijing 100871, Peoples R China
关键词
chance-constrained; management; two-stage; uncertainty; water quality; UNCERTAINTY; OPTIMIZATION; SYSTEMS;
D O I
10.1089/ees.2011.0317
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A two-stage inexact-probabilistic programming (TIPP) method was developed for water quality management in Zhangweinan River Basin, through coupling two-stage stochastic programming with inexact chance-constrained programming. The developed TIPP can handle uncertainties presented as both discrete intervals and probability distributions, and can support the assessment of the reliability of satisfying (or the risk of violating) system's constraints for accomplishing a maximized system benefit. It can also be used for analyzing policy scenarios that are associated with different levels of economic penalties when the promised targets are violated. Interval solutions under different constraint-violation levels have been obtained. They can be used for generating decision alternatives and thus help managers to identify desired policies under various environmental, economic, and system-reliability constraints.
引用
收藏
页码:713 / 725
页数:13
相关论文
共 50 条
  • [1] Inexact two-stage stochastic credibility constrained programming for water quality management
    Li, Zhong
    Huang, Gordon
    Zhang, Yimei
    Li, Yongping
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2013, 73 : 122 - 132
  • [2] An inexact two-stage fuzzy-stochastic programming model for water resources management
    Lu, H. W.
    Huang, G. H.
    Zeng, G. M.
    Maqsood, I.
    He, L.
    [J]. WATER RESOURCES MANAGEMENT, 2008, 22 (08) : 991 - 1016
  • [3] An inexact two-stage stochastic programming model for water resources management under uncertainty
    Huang, GH
    Loucks, DP
    [J]. CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2000, 17 (02) : 95 - 118
  • [4] An Inexact Two-stage Fuzzy-stochastic Programming Model for Water Resources Management
    H. W. Lu
    G. H. Huang
    G. M. Zeng
    I. Maqsood
    L. He
    [J]. Water Resources Management, 2008, 22 : 991 - 1016
  • [5] A two-stage inexact joint-probabilistic programming method for air quality management under uncertainty
    Lv, Y.
    Huang, G. H.
    Li, Y. P.
    Yang, Z. F.
    Sun, W.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2011, 92 (03) : 813 - 826
  • [6] An inexact two-stage stochastic programming model for water resources management in Nansihu Lake Basin, China
    Xie, Y. L.
    Huang, G. H.
    Li, W.
    Li, J. B.
    Li, Y. F.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2013, 127 : 188 - 205
  • [7] An Inexact Two-Stage Water Quality Management Model for Supporting Sustainable Development in a Rural System
    Zhang, N.
    Li, Y. P.
    Huang, W. W.
    Liu, J.
    [J]. JOURNAL OF ENVIRONMENTAL INFORMATICS, 2014, 24 (01) : 52 - 64
  • [8] Inexact fuzzy two-stage programming for water resources management in an environment of fuzziness and randomness
    Hu, Qing
    Huang, Guohe
    Liu, Zhenfang
    Fan, Yurui
    Li, Wei
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2012, 26 (02) : 261 - 280
  • [9] Inexact fuzzy two-stage programming for water resources management in an environment of fuzziness and randomness
    Qing Hu
    Guohe Huang
    Zhenfang Liu
    Yurui Fan
    Wei Li
    [J]. Stochastic Environmental Research and Risk Assessment, 2012, 26 : 261 - 280
  • [10] An Inexact Two-Stage Allocation Model for Water Resources Management Under Uncertainty
    Li, C. Y.
    Zhang, L.
    [J]. WATER RESOURCES MANAGEMENT, 2015, 29 (06) : 1823 - 1841