Continuous BIM-based assessment of embodied environmental impacts throughout the design process

被引:114
|
作者
Cavalliere, Carmine [1 ,2 ]
Habert, Guillaume [2 ]
Dell'Osso, Guido Raffaele [1 ]
Hollberg, Alexander [2 ]
机构
[1] Polytech Univ Bari, Dept Civil Environm Land Bldg Engn & Chem, Via Edoardo Orabona 4, I-70125 Bari, Italy
[2] Swiss Fed Inst Technol, Chair Sustainable Construct, Stefano Franscini Pl 5, CH-8093 Zurich, Switzerland
关键词
Life cycle assessment (LCA); Building information modelling (BIM); Embodied environmental impacts; Level of development (LOD); Design process; Sustainability; LIFE-CYCLE ASSESSMENT; EARLY-STAGE; BUILDINGS; ENERGY; LCA; CONSTRUCTION; EMISSIONS; CARBON; SUSTAINABILITY; OPTIMIZATION;
D O I
10.1016/j.jclepro.2018.11.247
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Life Cycle Assessment (LCA) is a suitable method to analyse and improve the environmental impact of buildings. However, it is complex to apply in the design phase. Building Information Modelling (BIM) can help to perform LCA during the design process. Current BIM-LCA approaches follow two trends. Either they use complex models in detailed design phases, when it is late for major changes, or they are based on simplified approaches only applicable in early design stages. This paper proposes a novel method for applying LCA continuously over the entire building design process to assess the embodied environmental impacts by using the data provided by BIM with as much accuracy as possible in each stage. The method uses different LCA databases with different levels of detail for the specific level of development (LOD) of the BIM. Since different building elements are not modelled with identical LODs in each design phase, the assessment of embodied environmental impacts is conducted by consistently mixing the LCA databases, which is possible as long as the databases use identical background data. The method is applied to five design stages of a building case study. The results show that it is now possible to calculate the embodied impacts in all design stages while being consistent with the results from the completed project. The environmental impact in a certain design phase is always within the range of variability of the previous phase. Therefore, the method allows to estimate the final embodied environmental impact with increasing accuracy and by that provide information for decision-making throughout the whole design process. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:941 / 952
页数:12
相关论文
共 50 条
  • [1] BIM-based environmental impact assessment for infrastructure design projects
    van Eldik, Maarten Albert
    Vahdatikhaki, Faridaddin
    dos Santos, Joao Miguel Oliveira
    Visser, Maarten
    Doree, Andre
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 120
  • [2] Dynamo script and a BIM-based process for measuring embodied carbon in buildings during the design phase
    Alzara, Majed
    Yosri, Ahmed M.
    Alruwaili, Amer
    Cuce, Erdem
    Eldin, Sayed M.
    Ehab, A.
    [J]. INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2023, 18 : 943 - 955
  • [3] Automated and continuous BIM-based life cycle carbon assessment for infrastructure design projects
    Hussain, Mudasir
    Zheng, Bowen
    Chi, Hung -Lin
    Hsu, Shu-Chien
    Chen, Jieh-Haur
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2023, 190
  • [4] A BIM-based tool for embodied carbon assessment using a Construction Classification System
    Parece, Sara
    Resende, Ricardo
    Rato, Vasco
    [J]. DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2024, 19
  • [5] A BIM-based model for constructability assessment of conceptual design
    Fadoul, Abdelaziz
    Tizani, Walid
    Koch, Christian
    [J]. ADVANCES IN COMPUTATIONAL DESIGN, 2018, 3 (04): : 367 - 384
  • [6] An integrated BIM-based framework for minimizing embodied energy during building design
    Shadram, Farshid
    Johansson, Tim David
    Lu, Weizhuo
    Schade, Jutta
    Olofsson, Thomas
    [J]. ENERGY AND BUILDINGS, 2016, 128 : 592 - 604
  • [7] BIM-based process management model for building design and refurbishment
    Leonas Ustinovichius
    Vladimir Popov
    Jovita Cepurnaite
    Tatjana Vilutienė
    Michail Samofalov
    Czesław Miedziałowski
    [J]. Archives of Civil and Mechanical Engineering, 2018, 18 : 1136 - 1149
  • [8] Automated BIM-based process for wind engineering design collaboration
    Mohammad Delavar
    Girma T. Bitsuamlak
    John K. Dickinson
    Leandro Malveira F. Costa
    [J]. Building Simulation, 2020, 13 : 457 - 474
  • [9] Automated BIM-based process for wind engineering design collaboration
    Delavar, Mohammad
    Bitsuamlak, Girma T.
    Dickinson, John K.
    Costa, Leandro Malveira F.
    [J]. BUILDING SIMULATION, 2020, 13 (02) : 457 - 474
  • [10] BIM-based process management model for building design and refurbishment
    Ustinovichius, Leonas
    Popov, Vladimir
    Cepurnaite, Jovita
    Vilutiene, Tatjana
    Samofalov, Michail
    Miedzialowski, Czeslaw
    [J]. ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2018, 18 (04) : 1136 - 1149