Multi-objective genetic algorithms for scheduling mateiral handling equipment at automated air cargo terminals

被引:0
|
作者
Lau, HYK [1 ]
Zhao, Y [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In order to improve the productivities of a typical cargo handling system, it is important to reduce the waiting time of stacker cranes (SCs) and the total traveling time of automated guided vehicles (AGVs) through efficient scheduling of SCs and AGVs, which are cooperating tightly to perform cargo handling operations in an optimal way. In this paper, we develop and investigate the application of the multi-objective genetic algorithm (MOGA) to solve such scheduling problem with the objectives of minimizing the AGV total traveling time and the total delay time of the SC. The results of the experiments demonstrated that MOGA produces better solutions than the single objective genetic algorithms.
引用
收藏
页码:712 / 717
页数:6
相关论文
共 50 条
  • [1] Multi-objective genetic algorithms for scheduling mateiral handling equipment at automated air cargo terminals
    Lau, HYK
    Zhao, Y
    2004 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2004, : 718 - 723
  • [2] Joint scheduling of material handling equipment in automated air cargo terminals
    Lau, HYK
    Zhao, Y
    COMPUTERS IN INDUSTRY, 2006, 57 (05) : 398 - 411
  • [3] Freight handling personnel scheduling at air cargo terminals
    Nobert, Y
    Roy, J
    TRANSPORTATION SCIENCE, 1998, 32 (03) : 295 - 301
  • [4] Freight handling personnel scheduling at air cargo terminals
    Universite du Quebec a Montreal, Montreal, Canada
    Transp Sci, 3 (295-301):
  • [5] Integrated scheduling of handling equipment at automated container terminals
    Henry Y. K. Lau
    Ying Zhao
    Annals of Operations Research, 2008, 159 : 373 - 394
  • [6] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 665 - 682
  • [7] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 373 - 394
  • [8] Precast production scheduling using multi-objective genetic algorithms
    Ko, Chien-Ho
    Wang, Shu-Fan
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (07) : 8293 - 8302
  • [9] Air Cargo Scheduling using Genetic Algorithms
    Fong, Simon
    Da Costa, Miguel Gomes, Jr.
    Khoury, Richard
    2013 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL AND BUSINESS INTELLIGENCE (ISCBI), 2013, : 170 - 173
  • [10] MULTI-OBJECTIVE SHIP'S CARGO HANDLING MODEL
    Hess, Mirano
    Hess, Svjetlana
    TRANSPORT, 2015, 30 (01) : 55 - 60