共 50 条
- [1] Quality control for installation of augered cast-in-place piles AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 55 - 68
- [2] Earth retention using augered cast-in-place piles AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 95 - 99
- [3] Augered Cast-In-Place Piles Embedded in Cobbles and Boulders in Honolulu IFCEE 2018: CASE HISTORIES AND LESSONS LEARNED, 2018, (298): : 13 - 24
- [4] Economy and Design of Augered Cast-In-Place Piles at the Fargo WTP IFCEE 2018: CASE HISTORIES AND LESSONS LEARNED, 2018, (298): : 1 - 12
- [5] Practical experience with nondestructive testing of augered cast-in-place piles AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 75 - 93
- [6] A quality control system for augered cast-in-place pile installation AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 69 - 74