Scheduling optimization of component mounting in printed circuit board assembly by prioritizing simultaneous pickup

被引:0
|
作者
Tsuchiya, Tbru [1 ]
Yamashita, Atsushi [1 ,2 ]
Kaneko, Toru [1 ]
Kaneko, Yasuhiro [3 ]
Muramatsu, Hirokatsu [3 ]
机构
[1] Shizuoka Univ, Fac Engn, Dept Mech Engn, Naka Ku, 3-5-1 Johoku, Hamamatsu, Shizuoka 4328561, Japan
[2] CALTECH, Dept Mech Engn, Pasadena, CA 91125 USA
[3] i PULSE CO LTD, Kita Ku, Hamamatsu, Shizuoka 4312103, Japan
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we propose a new method for reducing assembly time in printed circuit board (PCB) assembly by prioritizing efficient simultaneous pickup operation of placement machines. Despite using the same placement machine, the efficiency of the schedule results in major different assembly time. Therefore, it is important to optimize the scheduling of component mounting. There are three major problems of the scheduling: (1) component feeder location (affects efficiency of pickup operation), (2) mounting sequencing (affects total distance of the mounting tour), and (3) simultaneous pickup (affects efficiency of pickup operation). To solve these problems, this paper proposes the following approaches. We solve (1) and (3) in a heuristic way by using a random multi-start local search. We solve (2) greedily with putting the result of the feeder array to effective use. The effectiveness of the proposed method was shown through simulations.
引用
收藏
页码:2919 / +
页数:2
相关论文
共 50 条
  • [1] A SIMULTANEOUS-MOUNTING PROCESS FOR AUTOMATED PRINTED-CIRCUIT BOARD ASSEMBLY
    CHANG, CM
    YOUNG, L
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) : 2051 - 2064
  • [2] The Optimization of Printed Circuit Board Assembly Scheduling for a large parallel system
    Jin, Zhihong
    Liu, Ying
    Jing, Shaoying
    [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2651 - 2655
  • [3] Optimization of Printed Circuit Board Assignment and Component Allocation in Assembly Line
    Du, Xuan
    Li, Zongbin
    Zhang, Guohui
    [J]. MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2455 - 2458
  • [4] Modeling the Printed Circuit Board Assembly Scheduling
    Wan, Jiuwen
    Guo, Beibei
    Jin, Zhihong
    [J]. ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1207 - 1211
  • [5] Integrated modeling and optimization of printed circuit board assembly process planning and scheduling
    Du X.
    Li Z.
    [J]. Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2011, 47 (01): : 152 - 160
  • [6] Optimization of surface component mounting on the printed circuit board using SOM-TSP method
    Fujimura, K
    Obu-Cann, K
    Tokutaka, H
    [J]. NINTH INTERNATIONAL CONFERENCE ON ARTIFICIAL NEURAL NETWORKS (ICANN99), VOLS 1 AND 2, 1999, (470): : 643 - 648
  • [7] An effective algorithm for a surface mounting machine in printed circuit board assembly
    Lee, SH
    Hong, JM
    Kim, DW
    Lee, BH
    [J]. IROS '97 - PROCEEDINGS OF THE 1997 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOT AND SYSTEMS: INNOVATIVE ROBOTICS FOR REAL-WORLD APPLICATIONS, VOLS 1-3, 1996, : 932 - 937
  • [8] The component retrieval problem in printed circuit board assembly
    Crama, Y
    Flippo, OE
    VandeKlundert, J
    Spieksma, FCR
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (04): : 287 - 312
  • [9] Component Grouping for Automatic Printed Circuit Board Assembly
    M. T. Sze
    P. Ji
    W. B. Lee
    [J]. The International Journal of Advanced Manufacturing Technology, 2002, 19 : 71 - 77
  • [10] Component grouping for automatic printed circuit board assembly
    Sze, MT
    Ji, P
    Lee, WB
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (01): : 71 - 77