Fast Warning Method for Rigid Hangers in a High-Speed Railway Arch Bridge Using Long-Term Monitoring Data

被引:14
|
作者
An, Yonghui [1 ,2 ]
Guan, Delong [3 ]
Ding, Youliang [4 ]
Ou, Jinping [1 ]
机构
[1] Dalian Univ Technol, Dept Civil Engn, State Key Lab Coastal & Offshore Engn, Dalian 116023, Peoples R China
[2] Dalian Univ Technol, State Key Lab Struct Anal Ind Equipment, Dalian 116023, Peoples R China
[3] Dalian Univ Technol, Dept Civil Engn, Dalian 116023, Peoples R China
[4] Southeast Univ, Minist Educ, Key Lab C&PC Struct, Nanjing 210096, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Fast warning method; Rigid hanger; High-speed railway arch bridge; Reference service condition database; DAMAGE IDENTIFICATION; FATIGUE PERFORMANCE; VIBRATION; SIMULATION;
D O I
10.1061/(ASCE)CF.1943-5509.0001097
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Excessive vibration of arch bridge hangers is a potential threat to the driving safety of high-speed trains; therefore, it is important to study the vibration characteristics and fast warning method of the hanger under environmental factors such as high-speed train load and ambient excitation. The Nanjing Dashengguan Yangtze River Bridge, the longest high-speed railway arch bridge in the world, with a design speed of 300 km/h, was selected as the research subject in this paper to investigate the fast warning method for rigid hangers in a high-speed railway arch bridge. This work analyzes the influence of environmental factors on the hanger's transverse vibration characteristics using long-term monitoring data: several transverse vibration characteristics of the hanger, which are induced by train or ambient wind, were obtained through vibration data collected from the structural health monitoring system; eight train load cases were classified; and the methods of excluding train speed, temperature, and ambient wind are introduced. This paper proposes a method for establishing a reference service condition database including different subdatabases for a hanger. Finally, three reference service condition subdatabases are provided as examples to introduce the fast warning method. The conclusions show that environmental factors influence a hanger's transverse vibration characteristics, and environmental factors must be considered in the condition evaluation of the hangers. All of these provide a systematic method for establishing a hanger's reference service condition database, which can be used for fast warning of hanger anomalies in a highspeed railway arch bridge. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Long-term monitoring of Sesia high speed railway bridge
    Chellini, G.
    Lippi, F. V.
    Nardini, L.
    Salvatore, W.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2077 - 2083
  • [2] Fatigue Behavior Evaluation of Full-Field Hangers in a Rigid Tied Arch High-Speed Railway Bridge: Case Study
    Zhong, Wen
    Ding, You-liang
    Song, Yong-sheng
    Zhao, Han-wei
    JOURNAL OF BRIDGE ENGINEERING, 2018, 23 (05)
  • [3] STUDY ON METHOD OF HIGH-SPEED RAILWAY BRIDGE PIER AND ABUTMENT PILE FOUNDATION SETTLEMENT LONG-TERM MONITORING
    Zhao, Jian
    Leng, Wuming
    Yang, Qi
    Xu, Fang
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 724 - 729
  • [4] Long-term settlement prediction of high-speed railway bridge pile foundation
    Qi Yang
    Wu-ming Leng
    Sheng Zhang
    Ru-song Nie
    Li-min Wei
    Chun-yan Zhao
    Wei-zheng Liu
    Journal of Central South University, 2014, 21 : 2415 - 2424
  • [5] Long-term settlement prediction of high-speed railway bridge pile foundation
    杨奇
    冷伍明
    张升
    聂如松
    魏丽敏
    赵春彦
    刘维正
    Journal of Central South University, 2014, 21 (06) : 2415 - 2424
  • [6] Long-term settlement prediction of high-speed railway bridge pile foundation
    Yang Qi
    Leng Wu-ming
    Zhang Sheng
    Nie Ru-song
    Wei Li-min
    Zhao Chun-yan
    Liu Wei-zheng
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (06) : 2415 - 2424
  • [7] Design on High-speed Railway Long-span Composite Bridge of Continuous Rigid Frame and Flexible Arch
    Luo, Chunlin
    Journal of Railway Engineering Society, 2020, 37 (06) : 53 - 57
  • [8] Dynamic Analysis of the Hangers in High-Speed Railway Arch Bridge Based on Train-Bridge Interaction Simulation and Field Measurement
    Li, Huile
    Yan, Huan
    Wu, Gang
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2024,
  • [9] Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method
    Ren, Wen-Feng
    Wang, Xing-Hua
    Tu, Peng
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2012, 12 (05): : 28 - 36
  • [10] LONG-TERM MONITORING OF HIGH-SPEED RAILWAY TRACK USING OPTICAL FIBER SENSING TECHNIQUES
    Lin, Chao
    Gao, Liang
    Cai, Xiaopei
    Dai, Junxue
    Zhang, Cheng
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 425 - 428