共 50 条
- [1] Long-term monitoring of Sesia high speed railway bridge BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2077 - 2083
- [3] STUDY ON METHOD OF HIGH-SPEED RAILWAY BRIDGE PIER AND ABUTMENT PILE FOUNDATION SETTLEMENT LONG-TERM MONITORING KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 724 - 729
- [4] Long-term settlement prediction of high-speed railway bridge pile foundation Journal of Central South University, 2014, 21 : 2415 - 2424
- [9] Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2012, 12 (05): : 28 - 36
- [10] LONG-TERM MONITORING OF HIGH-SPEED RAILWAY TRACK USING OPTICAL FIBER SENSING TECHNIQUES CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 425 - 428