共 50 条
- [1] Based on fuzzy theory analysis method applied to community underground building fire risk assessment [J]. 2020 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, PTS 1-5, 2020, 546
- [2] Risk assessment of fire casualty in underground commercial building based on FFTA-BN model [J]. Journal of Safety Science and Resilience, 2024, 5 (04): : 470 - 485
- [3] Research on public building fire risk assessment control model [J]. PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 3640 - 3645
- [4] The Fire Safety Analysis of Semi-underground Public Building [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 739 - +
- [5] Assessment for the fire risk of the underground parking area [J]. Manufacturing and Engineering Technology, 2015, : 159 - 162
- [6] Integrated agent-based simulation and evacuation risk-assessment model for underground building fire: A case study [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 40
- [7] Risk Assessment of Building Fire Safety Based on the Extension Theory [J]. 2014 INTERNATIONAL SYMPOSIUM ON COMPUTER, CONSUMER AND CONTROL (IS3C 2014), 2014, : 872 - 875
- [9] Building fire insurance premium rate based on quantitative risk assessment [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2023, 63 (05): : 775 - 782