LSST Telescope and Site Status

被引:1
|
作者
Gressler, William J. [1 ]
Coleman, Grissel [1 ]
Delgado, Francisco [1 ]
Neill, Douglas R. [1 ]
Sebag, Jacques [1 ]
Serio, Andrew [1 ]
Thomas, Sandrine [1 ]
机构
[1] Large Synopt Survey Telescope, 950 N Cherry Ave, Tucson, AZ 85719 USA
来源
基金
美国国家科学基金会;
关键词
LSST; telescope; DESIGN;
D O I
10.1117/12.2311313
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
The Large Synoptic Survey Telescope (LSST) Project(1) received its construction authorization from the National Science Foundation in August 2014. The LSST Telescope and Site (T&S) group has achieved significant progress in the development and delivery of an integrated telescope system solution to meet the LSST science mission requirements. The summit facility construction has been completed on Cerro Pachon in Chile, construction of the base facility and data center continues in La Serena, and many major vendor subsystem integration and verification efforts are currently in progress. This paper summarizes the status of the T&S group, which is responsible to provide the summit and base facilities and infrastructure necessary to support the wide, fast, deep LSST survey mission. The major elements of the telescope system are well into factory assembly and testing, in anticipation of shipping, integration and final acceptance testing and verification on the summit. Progress continues on the dome system assembly atop the lower enclosure of the summit facility. The M1M3 primary/tertiary and M2 secondary mirror assembly systems are undergoing integrated system testing prior to shipment to Chile. Factory testing has been achieved on the telescope mount assembly, hexapod and rotator systems, coating plant, and the auxiliary calibration telescope. Other in-house efforts including software for observatory supervisory functions, scheduling of the survey, and active optics control has also advanced. The summary status of these subsystems and future integration and verification plans are presented.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] LSST Telescope and Site Status
    Gressler, William J.
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES VI, 2016, 9906
  • [2] LSST Telescope and Site Status
    Gressler, W.
    DeVries, J.
    Hileman, E.
    Neill, D. R.
    Sebag, J.
    Wiecha, O.
    Andrew, J.
    Lotz, P.
    Schoening, W.
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES V, 2014, 9145
  • [3] Seismic Analysis of the LSST Telescope
    Neill, Douglas R.
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES IV, 2012, 8444
  • [4] LSST Telescope Modeling Overview
    Sebag, J.
    Andrew, J.
    Angeli, G.
    Araujo, C.
    Barr, J.
    Callahan, S.
    Cho, M.
    Claver, C.
    Daruich, F.
    Gressler, W.
    Hileman, E.
    Liang, M.
    Muller, G.
    Neill, D.
    Schoening, B.
    Warner, M.
    Wiecha, O.
    Xin, B.
    Orden Martinez, Alfredo
    Perezagua Aguado, Manuel
    Garcia Marchena, Luis
    Ruiz de Argandona, Ismael
    [J]. MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VII, 2016, 9911
  • [5] LSST Telescope Integration and Tests
    Sebag, Jacques
    Gressler, William
    Neill, Doug
    Barr, Jeff
    Claver, Chuck
    Andrew, John
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES V, 2014, 9145
  • [6] Application of a component template for designing and implementing LSST telescope and site software components
    Lotz, Paul J.
    Anania, Andres
    Sundararaman, Harini
    Contaxis, Christopher
    [J]. SOFTWARE AND CYBERINFRASTRUCTURE FOR ASTRONOMY V, 2018, 10707
  • [7] Calibrations of LSST camera and telescope systems
    Burke, David
    Axelrod, Tim
    Claver, Chuck
    Frank, James
    Geary, John
    Gilmore, Kirk
    Lvezic, Zeljko
    Krabbendam, Victor
    Monet, David
    O'Connor, Paul
    Oliver, John
    Olszewski, Ed
    Pinto, Philip
    Saha, Abhijit
    Smith, Chris
    Stubbs, Christopher
    Takacs, Peter
    Tyson, Anthony
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES, PTS 1 AND 2, 2006, 6267
  • [8] Seismic Design Accelerations for the LSST Telescope
    Neill, Douglas R.
    Warner, Mike
    Sebag, Jacques
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES IV, 2012, 8444
  • [9] LSST site evaluation
    Sebag, Jacques
    Krabbendam, Victor
    Claver, Chuck
    Barr, Jeff
    Barr, Joshua
    Kantor, Jeff
    Saha, Abhijt
    Erasmus, D. Andre
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES, PTS 1 AND 2, 2006, 6267
  • [10] LSST Telescope Primary/Tertiary Mirror Hardpoints
    DeVries, Joe
    Neill, Douglas
    Hileman, Ed
    [J]. MODERN TECHNOLOGIES IN SPACE- AND GROUND-BASED TELESCOPES AND INSTRUMENTATION, 2010, 7739