Study on Numerical Simulation of Optimization of the Width of Coal Pillar in Caving Roadway at Fully-Mechanized Caving Face of Deep Mine

被引:0
|
作者
Gao Mingtao [1 ]
Zhou Ming [1 ]
机构
[1] Xinwen Min Grp Co Ltd, Tai An 271200, Shandong, Peoples R China
关键词
Fully-mechanized caving face; Caving roadway; Optimization of coal pillar width; Numerical simulation;
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
This paper, with some full-mechanized caving mining face of Xin Julong Coal Mine as the research object, has conducted simulation research on caving roadways with different sizes of coal pillars under the action of mining-induced stress, obtained the deformation and fracture characteristics of surrounding rock of various roadways, and determined the reasonable coal pillar width of caving roadway to be 4m. The width 4m ensures to reduce the damage of mine pressure to roadway in the stope lateral internal stress, improves the stability of surrounding rock of roadway, and is of great significance to ensuring efficient, safe production of mine, and provides a reference for mines with other similar geological conditions.
引用
收藏
页码:63 / 70
页数:8
相关论文
共 50 条
  • [1] Reasonable Width of Segment Pillar of Fully-Mechanized Caving Face in Inclined Extra-Thick Coal Seam
    Fan N.
    Wang J.
    Zhang B.
    Liu D.
    Wang R.
    [J]. Geotechnical and Geological Engineering, 2020, 38 (04): : 4189 - 4200
  • [2] Study on the Mechanism of a Hanging Roof at a Difficult Caving End in a Fully-Mechanized Top Coal Caving Face
    Liu, Hongtao
    Hao, Cheng
    Han, Zijun
    Liu, Qinyu
    Wang, Haozhu
    Liang, Jialu
    Zhang, Dandan
    [J]. SUSTAINABILITY, 2023, 15 (01)
  • [3] Study on the rational width of coal pillars for protecting roadway in fully mechanized top caving mining face
    Zhang, S. J.
    Wang, J. A.
    Wu, H. W.
    Li, F.
    [J]. ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 719 - 730
  • [4] Numerical Simulation Study on Fully-Mechanized Top Coal Caving in Extra-Thick Coal Seam
    Lei, Wu-lin
    Li, Xingliang
    Chen, Yanfeng
    Duan, Weihua
    Chen, Jianhua
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [5] Design of coal pillar with roadway driving along goaf in fully mechanized top-coal caving face
    Chang, Jucai
    Xie, Guangxiang
    Yang, Ke
    [J]. MINE SAFETY AND EFFICIENT EXPLOITATION FACING CHALLENGES OF THE 21ST CENTURY, 2010, : 235 - 241
  • [6] Mechanism and control strategy of asymmetrical floor heave of coal pillar roadway in fully mechanized caving face
    Jia, Housheng
    Wang, Luyao
    Liu, Shaowei
    Peng, Bo
    Zhang, Weiguang
    Fan, Kai
    [J]. Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (04): : 1030 - 1040
  • [7] Numerical simulation and analysis of underground pressure in the 101 fully-mechanized top coal caving face of the Tingnan Coalmine
    LI ShugangPAN HongyuKONG TingtingZHANG ZhimingWANG HongtaoSchool of Energy EngineeringXian University of Science and TechnologyXian ChinaDepartment ofMining Mechanical and ElectronicHuainan Vocational and Technical CollegeHuainan ChinaTingnan CoalIndustry Limited Liability Company of Shannxi ChangwuChangwu China
    [J]. Journal of Coal Science & Engineering(China)., 2009, 15 (01) - 32
  • [8] Numerical simulation and analysis of underground pressure in the 101 fully-mechanized top coal caving face of the Tingnan Coalmine
    LI Shu-gang~1
    2.Department ofMining Mechanical and Electronic
    3.Tingnan CoalIndustry Limited Liability Company of Shannxi Changwu
    [J]. International Journal of Coal Science & Technology, 2009, (01) : 28 - 32
  • [9] Research and application of key technology of intelligent coal caving in high gas fully-mechanized top coal caving face
    Cui, Yao
    Wu, Jinghong
    Ye, Zhuang
    Zhang, Senlang
    [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 (10): : 252 - 265
  • [10] Stability analysis and width determination of small chain coal pillar in fully mechanized sublevel caving face
    Zang Chuanwei
    Wu Shiliang
    [J]. MINE HAZARDS PREVENTION AND CONTROL TECHNOLOGY, 2007, : 231 - 236