Integrated Repair Shop Scheduling and Spare Parts Pooling for Robust Product Regeneration

被引:0
|
作者
Lucht, T. [1 ]
Wojcik, A. [1 ]
Nyhuis, P. [1 ]
机构
[1] Leibniz Univ Hannover, Inst Prod Syst & Logist IFA, Hannover, Germany
关键词
Pooling; spare parts; scheduling; PPC; MRO; integrated planning; robustness; SYSTEMS; MODEL; MAINTENANCE; STRATEGIES; OPERATIONS; POLICIES; SERVICE;
D O I
10.1109/IEEM50564.2021.9673058
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The regeneration of complex capital goods is subject to significant information uncertainty with regard to the capacity and material demand to be expected from a regeneration order. One suitable measure to prevent losses in capacity utilization or delays caused by missing material supply is pooling of spare parts over several pool stages. In order to make optimal use of the mostly scarcely available pool components (due to their high price) in terms of increasing the robustness of the logistics processes, material management and production planning and control (PPC) require close coordination. This paper presents an approach to integrate multi-stage spare parts pooling and repair shop scheduling for the regeneration of complex capital goods using mathematical modeling. In addition to various logistics interdependencies, this approach also takes into account typical uncertainties and dynamics drivers in regeneration. Finally, the logistics potential of this approach is demonstrated by integrating it into an event-driven, rolling planning approach and its application to an exemplary use case.
引用
收藏
页码:200 / 206
页数:7
相关论文
共 8 条
  • [1] Improving spare parts inventory control at a repair shop
    van Jaarsveld, Willem
    Dollevoet, Twan
    Dekker, Rommert
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 57 : 217 - 229
  • [2] Modelling and optimization for integrated scheduling problem considering spare parts production, batch transportation and equipment operation
    Zhuang, Huining
    Deng, Qianwang
    Luo, Qiang
    Zhao, Yan
    Zhang, Jingxing
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2024, 252
  • [3] Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests
    Pham, Dai T.
    Kiesmueller, Gudrun P.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2022, 148
  • [4] Formulating and solving the integrated batching, routing, and picker scheduling problem in a real-life spare parts warehouse
    van Gils, Teun
    Caris, An
    Ramaekers, Katrien
    Braekers, Kris
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (03) : 814 - 830
  • [5] Modelling, analysis and improvement of an integrated chance-constrained model for level of repair analysis and spare parts supply control
    Liu, Weimiao
    Liu, Kanglin
    Deng, Tianhu
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (10) : 3090 - 3109
  • [6] Integrated supplier selection, scheduling, and routing problem for perishable product supply chain: A distributionally robust approach
    Hashemi-Amiri, Omid
    Ghorbani, Fahimeh
    Ji, Ran
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 175
  • [7] Adaptive Management of System Parameters of Maintenance, As Well As Repair and Optimization of Spare Parts, Tools and Accessories of the Integrated Radar System on the Basis of Reliability Model and Control Data
    Boev, S.
    Kiryanov, D.
    Matveeva, S.
    [J]. PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE FAR EAST CON (ISCFEC 2018), 2018, 47 : 581 - 584
  • [8] Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach
    Tadayonirad, Sahar
    Seidgar, Hany
    Fazlollahtabar, Hamed
    Shafaei, Rasoul
    [J]. ASSEMBLY AUTOMATION, 2019, 39 (05) : 944 - 962