Active and stable project scheduling

被引:18
|
作者
Neumann, K [1 ]
Nübel, H [1 ]
Schwindt, C [1 ]
机构
[1] Univ Karlsruhe, Inst Wirtschaftstheorie & Operat Res, D-76128 Karlsruhe, Germany
关键词
resource-constrained project scheduling; active and stable schedules; regular and nonregular objective functions; generation schemes;
D O I
10.1007/s001860000092
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper proposes a new classification of schedules for resource-constrained project scheduling problems with minimum and maximum time lags between project activities and regular and different types of nonregular objective functions. The feasible region of the scheduling problems represents a (generally disconnected) union of polytopes. In addition to the well-known concepts of active and semiactive schedules, pseudoactive and quasiactive as well as stable, semistable, pseudostable, and quasistable schedules are introduced. The (quasi-, pseudo-, semi-)active schedules are related to different types of left-shifts of sets of activities and correspond to minimal points of certain subsets of the feasible region. The (quasi-, pseudo-, semi-)stable schedules do not allow oppositely directed shifts and correspond to extreme points of certain subsets of the feasible region. The different sets of schedules contain optimal schedules for project scheduling problems which differ in their objective functions. The correspondence between those sets of schedules and vertices of specific polyhedral subsets of the feasible region can be exploited for analyzing schedule generation schemes which have been developed recently for finding solutions to the different classes of project scheduling problems.
引用
收藏
页码:441 / 465
页数:25
相关论文
共 50 条
  • [1] Active and stable project scheduling
    K. Neumann
    H. Nübel
    C. Schwindt
    [J]. Mathematical Methods of Operations Research, 2000, 52 : 441 - 465
  • [2] Note: On semi-active timetabling in resource-constrained project scheduling
    Sprecher, A
    Drexl, A
    [J]. MANAGEMENT SCIENCE, 1999, 45 (03) : 452 - 454
  • [3] PROJECT STABLE
    MILLER, A
    [J]. BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 1975, 56 (01) : 52 - 55
  • [4] On project scheduling problem
    A. A. Lazarev
    E. R. Gafarov
    [J]. Automation and Remote Control, 2008, 69 : 2070 - 2087
  • [5] Project management and scheduling
    Massimiliano Caramia
    [J]. Annals of Operations Research, 2020, 285 : 1 - 8
  • [6] Project scheduling - Preface
    Ulusoy, G
    Herroelen, W
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 : 13 - 16
  • [7] On Project Scheduling Problem
    Lazarev, A. A.
    Gafarov, E. R.
    [J]. AUTOMATION AND REMOTE CONTROL, 2008, 69 (12) : 2070 - 2087
  • [8] Project management and scheduling
    Valls, V
    Weglarz, J
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 285 - 288
  • [9] Stable Group Scheduling
    Lee, Hooyeon
    Shoham, Yoav
    [J]. AAMAS'14: PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON AUTONOMOUS AGENTS & MULTIAGENT SYSTEMS, 2014, : 1347 - 1348
  • [10] Project scheduling optimization of random graph MDP considering active/passive resource constraints
    Li, Aiqin
    Wang, Ningfei
    Yu, Jiecheng
    Deng, Cong
    [J]. MEASUREMENT, 2019, 144 : 7 - 13