Modernising I&C at Loviisa

被引:0
|
作者
Linden, Ulf [1 ]
机构
[1] Fortum, Loviisa Power Plant, Espoo, Finland
来源
NUCLEAR ENGINEERING INTERNATIONAL | 2015年 / 60卷 / 727期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:30 / 31
页数:2
相关论文
共 50 条
  • [1] Modernising digital I&C
    Duthou, Arnaud
    Desgeorge, Romain
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 2020, 65 (791): : 20 - 21
  • [2] I&C upgrade ends in success at Loviisa
    Lehtonen, Mika
    Challamel, Yann
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 2019, 64 (775): : 35 - 37
  • [3] More power to Finland - Modernising Loviisa
    Keskinen, A
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1997, 42 (515): : 32 - 33
  • [4] I&C
    不详
    [J]. NUCLEAR PLANT JOURNAL, 2010, 28 (03) : 13 - 13
  • [5] More power to Finland - Modernising Loviisa ... and Olkiluoto
    Rastas, A
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1997, 42 (515): : 33 - 34
  • [6] I&C training
    不详
    [J]. NUCLEAR PLANT JOURNAL, 2004, 22 (02) : 7 - 7
  • [7] Measures for the prevention and control of I&C failures - VGB guideline on I&C
    Maßnahmen zur Vermeidung und Beherrschung von Leittechnikausfällen -VGB-Richtlinien zum Thema Leittechnik
    [J]. Greiner, F., 2005, VGB-Kraftswerktechnik GmbH (85):
  • [8] A case for digital I&C
    Ammon, Robert
    Burzynski, Mark
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 2020, 65 (788): : 24 - 26
  • [9] I&C progress at Paks
    Ignits, M
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 2002, 47 (575): : 26 - 28
  • [10] I&C modernization at Dukovany
    Rosol, J
    [J]. NUCLEAR PLANT JOURNAL, 2006, 24 (02) : 49 - 50