This paper considers a single-machine scheduling problem with outsourcing allowed, where each job can be either processed on an in-house single-machine or outsourced. Outsourcing is commonly required as a way to improve productivity effectively and efficiently in various companies, especially, including electronics industries and motor industries. The objective is to minimize the weighted sum of the outsourcing cost and the scheduling measure represented by the sum of completion times, subject to outsourcing budget. In the problem analysis, it is proved that the proposed problem is NP-hard in the ordinary sense, and some solution properties are characterized. Therewith, two associated heuristic algorithms and the branch-and-bound algorithm are derived. Numerical experiments are conducted to evaluate the performance of the derived algorithms, and some managerial insights of the heuristic algorithms are provided. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:623 / 634
页数:12
相关论文
共 50 条
  • [1] Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed
    Lee, Ik Sun
    Sung, C. S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 186 (03) : 931 - 952
  • [2] THE SINGLE MACHINE SERIAL BATCH PRODUCTION SCEDULING WITH OUTSOURCING ALLOWED
    Zou, Juan
    Zhang, Yuzhong
    Miao, Cuixia
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2015, 22 (02): : 297 - 302
  • [3] An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed
    Tavares Neto, Roberto Fernandes
    Godinho Filho, Moacir
    da Silva, Fabio Molina
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (03) : 527 - 538
  • [4] An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed
    Roberto Fernandes Tavares Neto
    Moacir Godinho Filho
    Fabio Molina da Silva
    [J]. Journal of Intelligent Manufacturing, 2015, 26 : 527 - 538
  • [5] Single Machine Scheduling Problem with Batch Outsourcing
    Safarzadeh, H.
    Kianfar, F.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (05): : 1006 - 1016
  • [6] Scheduling of virtual manufacturing cells with outsourcing allowed
    Arkat, Jamal
    Ghahve, Homa
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2014, 27 (12) : 1079 - 1089
  • [7] OUTSOURCING DECISIONS IN SINGLE MACHINE SCHEDULING PROBLEM WITH MULTIPLE EXTERNAL FACILITIES
    Hong, Jung Man
    Lee, Jong Hyup
    [J]. JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2016, 24 (03): : 603 - 609
  • [8] A Single-Machine Scheduling Problem with Uncertainty in Processing Times and Outsourcing Costs
    Park, Myoung-Ju
    Choi, Byung-Cheon
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [9] An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
    Tavares Neto, R. F.
    Godinho Filho, M.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1286 - 1293
  • [10] A Hybrid Genetic Algorithm for Integrated Production and Distribution Scheduling Problem with Outsourcing Allowed
    Izadi, L.
    Ahmadizar, F.
    Arkat, J.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (11): : 2285 - 2298