共 50 条
- [1] Non-productive tool path optimisation of multi-tool part programmes The International Journal of Advanced Manufacturing Technology, 2011, 55 : 1007 - 1023
- [2] Non-productive tool path optimisation of multi-tool part programmes INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (9-12): : 1007 - 1023
- [4] Integrating risk management concepts into the drilling non-productive time Journal of Petroleum Exploration and Production, 2021, 11 : 887 - 900
- [10] Asset Operations: Non-productive Times During Oil Well Drilling PROCEEDINGS OF THE 7TH WORLD CONGRESS ON ENGINEERING ASSET MANAGEMENT (WCEAM 2012), 2015, : 43 - 48