MANAGING INTERACTING SOFTWARE PROJECT RISKS

被引:1
|
作者
Dey, Pradip Peter [1 ]
Khan, Muzibul [2 ]
Amin, Mohammad [1 ]
Sinha, Bhaskar Raj [1 ]
Badkoobehi, Hassan [1 ]
Jawad, Shatha [1 ]
Al Any, Laith [1 ]
机构
[1] Natl Univ, La Jolla, CA 92037 USA
[2] Kyocera Commun, Kyoto, Japan
关键词
Communication; iterative models; risk analysis; software development; volatility;
D O I
10.17261/Pressacademia.2016118662
中图分类号
F [经济];
学科分类号
02 ;
摘要
Managing risks in a software project can be challenging. There are many risk categories including communication risks, project planning risks, technical risks, budget risks, scheduling risks, legal risks, ethical risks, operational risks, security risks, and personnel risks that require timely attention. Potential risks should be identified, analyzed and evaluated. Appropriate strategies should be developed for managing imminent risks in a timely manner. This paper advocates a strategy that assigns a special role to communication risk, because it interacts with other risks in a way that may allow its coupling with most other risks and changing their effects. Interacting risks may have to be studied at a higher level with special attention to communication risk, because it could be considered as a super-risk. In order to get best results with the current state of knowledge, a team of risk analysts may provide early warnings about potential risks that are then further studied in interaction contexts for developing appropriate management strategies. By integrating risk based project management into a software development process, coordination of all activities in a comprehensive manner would be possible with a special emphasis on interacting risks.
引用
收藏
页码:427 / 433
页数:7
相关论文
共 50 条
  • [1] A Bayesian Critical Path Method for Managing Common Risks in Software Project Scheduling
    Ngoc-Tuan Nguyen
    Quyet-Thang Huynh
    Thi-Huong-Giang Vu
    [J]. PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON INFORMATION AND COMMUNICATION TECHNOLOGY (SOICT 2018), 2018, : 382 - 388
  • [2] Managing software security risks
    McGraw, G
    [J]. COMPUTER, 2002, 35 (04) : 99 - 101
  • [3] Managing project risks and uncertainties
    Mike Mentis
    [J]. Forest Ecosystems, 2015, 2 (01) : 31 - 44
  • [4] Managing project risks and uncertainties
    Mentis, Mike
    [J]. FOREST ECOSYSTEMS, 2015, 2
  • [5] Identifying and Managing Software Project Risks with Proposed Fuzzy Regression Analysis Techniques: Maintenance Phase
    Elzamly, Abdelrafe
    Hussin, Burairah
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MANAGEMENT AND ENGINEERING (CME 2014), 2014, : 1868 - 1879
  • [6] Managing a multicompany software development project
    Miller, RM
    [J]. HEWLETT-PACKARD JOURNAL, 1996, 47 (02): : 50 - 53
  • [7] Supporting risks in software project management
    Barros, MD
    Werner, CML
    Travassos, GH
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 2004, 70 (1-2) : 21 - 35
  • [8] A framework for identifying software project risks
    Keil, M
    Cule, PE
    Lyytinen, K
    Schmidt, RC
    [J]. COMMUNICATIONS OF THE ACM, 1998, 41 (11) : 76 - 83
  • [9] Software development risks to project effectiveness
    Jiang, J
    Klein, G
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 2000, 52 (01) : 3 - 10
  • [10] Monitoring software maintenance project risks
    Lopez, Cristina
    Salmeron, Jose L.
    [J]. 4TH CONFERENCE OF ENTERPRISE INFORMATION SYSTEMS - ALIGNING TECHNOLOGY, ORGANIZATIONS AND PEOPLE (CENTERIS 2012), 2012, 5 : 363 - 368