共 50 条
- [1] Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling [J]. PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 137 - 141
- [4] A clustering search metaheuristic for the bi-objective flexible job shop scheduling problem [J]. 2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 158 - 166
- [5] Improved nondominated sorting genetic algorithm-II for bi-objective flexible job-shop scheduling problem [J]. 2020 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2020, : 2616 - 2624
- [6] Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times [J]. PLOS ONE, 2016, 11 (12):
- [7] An improved multi-objective evolutionary algorithm based on decomposition for bi-objective fuzzy flexible job-shop scheduling problem [J]. Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2022, 39 (01): : 31 - 40
- [8] MILP modeling and optimization of flexible job shop scheduling problem with preventive maintenance [J]. Computers and Industrial Engineering, 2025, 201
- [9] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan [J]. Journal of Central South University of Technology, 2005, 12 : 167 - 171