共 50 条
- [1] Innovative design and solutions for mine water management on an alluvial floodplain [J]. Water Resources Management IV, 2007, 103 : 43 - 52
- [3] Characterisation of alluvial gold exploration data to improve gold recovery in Ghana [J]. Arabian Journal of Geosciences, 2020, 13
- [4] TELLURIDE MINERALIZATION AT ASHANTI GOLD MINE, GHANA [J]. MINERALOGICAL MAGAZINE, 1990, 54 : 617 - 627
- [5] Assessment of the quality of Block 4 pit water at Iduapriem Gold Mine, Tarkwa, Ghana [J]. MINE WATER - MANAGING THE CHALLENGES: PROCEEDINGS OF THE INTERNATIONAL MINE WATER ASSOCIATION CONGRESS 2011, 2011, : 3 - 6
- [7] NEW GHANA GOLD MINE SLATED FOR 1993 PRODUCTION [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 1992, 193 (01): : 9 - 9
- [8] Natural and artificial radioactivity distribution in soil, rock and water of the Central Ashanti Gold Mine, Ghana [J]. Environmental Earth Sciences, 2013, 70 : 1593 - 1604
- [10] Post closure management of the Mt Leyshon Gold Mine - Water the integrator [J]. WATER IN MINING 2006, PROCEEDINGS: MULTIPLE VALUES OF WATER, 2006, : 233 - 242