Research on Safety Management in the Water Conservancy and Hydropower Engineering Construction Process

被引:0
|
作者
Zheng Xiazhong [1 ]
Xiao Ling [1 ]
Zheng Genbao [1 ]
Zhang Guangfei [1 ]
机构
[1] Yichang Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang 443002, Hubei, Peoples R China
关键词
hidden peril of the accident; hidden complement event set; dangerous state; security state; safety management;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Taking Potential Hazard as study object, we propose that the entrance of dangerous state and management deficiency, the deterioration of the security state and management deficiency are the reasons for the formation of Potential Hazard. The concept of hidden complement event set was introduced into the process of investigation and rectification of Potential Hazard. For these hidden perils of the accidents that is impossible to rectify or rectification cost of which is unacceptable or rectification of which fails, we have taken to prevent the occurrence of hidden complement event set or to prevent potential accidents in contact with the hidden complement event set. Study on safety management methods in the water conservancy and hydropower construction process that the effective control of potential hazard plays important role in implementing china's principle of safety first, prevention first and comprehensive treatment and preventing and dealing with safety accidents.
引用
收藏
页码:2461 / 2466
页数:6
相关论文
共 50 条
  • [1] Knowledge graph for safety management standards of water conservancy construction engineering
    Chen, Yun
    Lu, Gengyang
    Wang, Ke
    Chen, Shu
    Duan, Chenfei
    [J]. Automation in Construction, 2024, 168
  • [2] Research on the water conservancy and hydropower system engineering based on ADHALL theory
    Ji Changming
    Li Fenhua
    Xing Jian
    Cui Xuekun
    [J]. 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [3] Key techniques for evaluation of safety monitoring sensors in water conservancy and hydropower engineering
    Xiang, Yan
    Wang, Lin
    Wang, Zhan-jun
    Yuan, Hui
    Guan, Yun-jie
    [J]. WATER SCIENCE AND ENGINEERING, 2012, 5 (04) : 440 - 449
  • [4] Key techniques for evaluation of safety monitoring sensors in water conservancy and hydropower engineering
    Yan XIANG
    Lin WANG
    Zhan-jun WANG
    Hui YUAN
    Yun-jie GUAN
    [J]. Water Science and Engineering, 2012, 5 (04) : 440 - 449
  • [5] The research in ADHALL three-dimensional structure of Water Conservancy and Hydropower Engineering
    Li, Fenhua
    Ji, Changming
    Xing, Jian
    Zhang, Junyu
    [J]. ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 4: MODELLING AND SIMULATION IN BIOLOGY, ECOLOGY & ENVIRONMENT, 2010, : 130 - 134
  • [6] Water conservancy and hydropower engineering construction system brittleness evaluation based on Choquest integral
    Zhang, Lei
    Li, Ziyang
    [J]. ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEM AND MATERIAL ENGINEERING, 2012, 459 : 638 - +
  • [7] A Study on Risk System of Water Conservancy and Hydropower Engineering
    Zhang, Hongyuan
    Liu, Yinghong
    [J]. ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEM AND MATERIAL ENGINEERING, 2012, 459 : 450 - +
  • [8] Study on Water Conservancy and Hydropower Engineering Risk Analysis
    Nan, Tianxiao
    [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND MANUFACTURING ENGINEERING (MMME 2016), 2016, 79 : 442 - 445
  • [9] Application of multimedia technology in water conservancy and hydropower engineering
    Zhao, Jingfeng
    Zhang, Jing
    [J]. JOURNAL OF VISUAL COMMUNICATION AND IMAGE REPRESENTATION, 2020, 71
  • [10] Construction Technology of Foundation Treatment for Water Conservancy and Hydropower Project
    Ma, Zhu
    [J]. 2017 7TH INTERNATIONAL CONFERENCE ON EDUCATION AND SPORTS EDUCATION (ESE 2017), VOL 3, 2017, 76 : 536 - 539