Bond strength of post-installed high strength deformed rebar in concrete

被引:24
|
作者
Ahmed, Khondaker Sakil [1 ]
Shahjalal, Md. [1 ]
Siddique, Tanvir Ahmed [1 ]
Keng, Ang Kok [2 ]
机构
[1] Mil Inst Sci & Technol MIST, Dept Civil Engn, Dhaka, Bangladesh
[2] Natl Univ Singapore, Dept Civil & Environm Engn, 1 Engn Dr 2, Singapore 117576, Singapore
关键词
Post-installed high strength rebar; Bond strength; Failure mode; Regression analysis; Rebar diameter; Embedment length; BEHAVIOR; PERFORMANCE; ADHESION; ANCHORS; DESIGN; RUBBER; PLAIN;
D O I
10.1016/j.cscm.2021.e00581
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the major aspects of retrofitting or strengthening of existing concrete structures is to install rebars using chemical adhesives. In a view to lighten the disturbance of existing structures by reducing the number of holes, high strength rebars (80 grade; nominal yield strength of 550 MPa) are more preferable for repairing and strengthening structural components. Here, a total of 108 specimens were prepared to evaluate the performance of post-installed high strength deformed rebar (PIHSDR) in concrete using pull-out tests. Test parameters included concrete compressive strength (f(c)' ), rebar diameter, embedment length of rebar into concrete and concrete cover to rebar diameter ratio (c/d(b)) to investigate the bond behaviors of PIHSDR at the epoxy-concrete interface. Bond stress-slip relationships for PIHSDR were obtained, investigated, and hence compared with previous research and available codes. It was observed that most of the specimens showed concrete rapture, splitting, or rebar rapture failure and none of them showed pull-out failure which indicates that the epoxy resins are very much effective as bonding chemicals for retrofitting concrete structures in the steel-concrete interface. Besides, regression analyses were performed using the experimental data to obtain a closed-form equation for predicting the bond strength for PIHSDR. The predicted bond strengths were observed close to the actual test data with a high coefficient of determination (R-2 = 0.99) and very low root mean square error (0.078).
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Bond strength analysis of post-installed rebar with chemical adhesive in concrete mixed with marble powder and glass fiber
    Multani, Anas Shahid
    Gupta, Praveen Kumar
    [J]. JOURNAL OF ADHESION SCIENCE AND TECHNOLOGY, 2024, 38 (07) : 1014 - 1042
  • [2] Experimental study on bond strength of adhesive post-installed rebar systems during fire
    Thuan, Le Tien
    Owa, Seira
    Song, Changsuk
    Ikeda, Kenichi
    [J]. Journal of Structural and Construction Engineering, 2019, 84 (758): : 575 - 582
  • [3] Bond strength analysis of post-installed rebar with chemical adhesive in concrete mixed with marble powder and glass fiber
    Multani, Anas Shahid
    Gupta, Praveen Kumar
    [J]. JOURNAL OF ADHESION SCIENCE AND TECHNOLOGY, 2023,
  • [4] Bond strength analysis of post-installed rebar with chemical adhesive in concrete mixed with marble powder and glass fiber
    Multani, Anas Shahid
    Gupta, Praveen Kumar
    [J]. Journal of Adhesion Science and Technology, 2024, 38 (07): : 1014 - 1042
  • [5] Post-installed mechanical fasteners in high strength and ultra-high strength performance concrete
    Schwenn, Michael
    Voit, Klaus
    Zeman, Oliver
    Bergmeister, Konrad
    [J]. Civil Engineering Design, 2019, 1 (5-6) : 161 - 167
  • [6] Evaluation of bond strength of bonded-in or post-installed reinforcement
    Hamad, BS
    Al Hammoud, R
    Kunz, J
    [J]. ACI STRUCTURAL JOURNAL, 2006, 103 (02) : 207 - 218
  • [7] Shear strength of an anchor post-installed into a hardened concrete member
    Foraboschi, Paolo
    [J]. ENGINEERING STRUCTURES, 2024, 302
  • [8] Bond strength analysis of post-installed rebar with chemical adhesive in concrete mixed with marble powder and glass fiber (Aug, 10.1080/01694243.2023.2245590, 2023)
    Multani, Anas Shahid
    Gupta, Praveen Kumar
    [J]. JOURNAL OF ADHESION SCIENCE AND TECHNOLOGY, 2024, 38 (12) : 0i - 0i
  • [9] Bond Strength of Post-installed Anchor Adhering to Damaged Concrete by Freeze-thaw Action
    Yano, Yuga
    Shiokoshi, Taito
    Takase, Yuya
    Ishida, Yutaro
    Abe, Takahide
    Takahashi, Muneomi
    Ishigaki, Tsutomu
    [J]. JOURNAL OF ADVANCED CONCRETE TECHNOLOGY, 2024, 22 (04) : 178 - 189
  • [10] For post-installed Rebar Clamp Connections
    不详
    [J]. BAUINGENIEUR, 2013, 88 : A20 - A20