共 50 条
- [2] PREDICTION OF LAY-UP CONSOLIDATION DURING THE LAMINATION OF EPOXY PREPREGS [J]. ACS SYMPOSIUM SERIES, 1987, 346 : 499 - 510
- [7] Automatic planning strategy for robotic lay-up of prepregs on a complex-shaped mold [J]. MATERIAL FORMING, ESAFORM 2024, 2024, 41 : 558 - 567
- [8] Cost-effective rapid prototyping and short-run tooling with CNC composite tooling planks [J]. TRANSACTIONS OF THE AMERICAN FOUNDRYMEN'S SOCIETY, VOL 105, 1998, 105 : 593 - 594
- [9] Participation in industry-wide voluntary approaches: Short-run vs. long-run equilibrium [J]. RECENT ADVANCES IN ENVIRONMENTAL ECONOMICS, 2002, : 142 - 157
- [10] Prototype vs. production tooling in rapid product development [J]. ANTEC 2000: SOCIETY OF PLASTICS ENGINEERS TECHNICAL PAPERS, CONFERENCE PROCEEDINGS, VOLS I-III, 2000, : 2974 - 2976