Wet lay-up vs. prepregs for short-run and prototype tooling

被引:0
|
作者
Romey, WB [1 ]
机构
[1] PTM&W Ind Inc, Sante Fe Springs, CA 90670 USA
关键词
tooling; prototype; prepregs;
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
This paper will compare the advantages and disadvantages of wet lay-up v. prepreg epoxy/carbon-fiber tooling materials with respect to model types, material costs, labor costs, safety issues, cure cycles and mechanical properties. These comparisons will be made with short-run epoxy/carbon prototype tooling in mind. It will show that wet lay-up construction is faster, lower cost and dimensionally and structurally comparable to prepreg construction for prototype tools.
引用
收藏
页码:450 / 464
页数:5
相关论文
共 50 条
  • [1] HOW TO USE SHORT-RUN TOOLING
    AUSTIN, M
    [J]. SPE JOURNAL, 1971, 27 (03): : 29 - &
  • [2] PREDICTION OF LAY-UP CONSOLIDATION DURING THE LAMINATION OF EPOXY PREPREGS
    TONG, HM
    SANGANI, AS
    [J]. ACS SYMPOSIUM SERIES, 1987, 346 : 499 - 510
  • [3] Short-run and prototype die casting
    Miller, RA
    [J]. DIE CASTING ENGINEER, 2000, 44 (03): : 24 - +
  • [4] Inflation and relative price variability: short-run vs. long-run
    Nath, HK
    [J]. ECONOMICS LETTERS, 2004, 82 (03) : 363 - 369
  • [5] SHORT-RUN TOOLING FOR FIBER-GLASS SHAPES
    STENGEL, RF
    HANEBRIN.D
    VANLEEUW.M
    HOCHADEL, JB
    [J]. DESIGN NEWS, 1969, 24 (15) : 26 - &
  • [6] A PROTOTYPE ASSEMBLY CELL FOR LAY-UP OF CARBON COMPOSITE PREFORMS
    MITCHELL, TA
    CHESTNEY, JA
    SARHADI, M
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1994, 11 (04) : 335 - 343
  • [7] Automatic planning strategy for robotic lay-up of prepregs on a complex-shaped mold
    Gambardella, Antonio
    Esperto, Vitantonio
    Carlone, Pierpaolo
    [J]. MATERIAL FORMING, ESAFORM 2024, 2024, 41 : 558 - 567
  • [8] Cost-effective rapid prototyping and short-run tooling with CNC composite tooling planks
    Martyniak, SA
    [J]. TRANSACTIONS OF THE AMERICAN FOUNDRYMEN'S SOCIETY, VOL 105, 1998, 105 : 593 - 594
  • [9] Participation in industry-wide voluntary approaches: Short-run vs. long-run equilibrium
    Dawson, NL
    Segerson, K
    [J]. RECENT ADVANCES IN ENVIRONMENTAL ECONOMICS, 2002, : 142 - 157
  • [10] Prototype vs. production tooling in rapid product development
    Castañeda, JC
    [J]. ANTEC 2000: SOCIETY OF PLASTICS ENGINEERS TECHNICAL PAPERS, CONFERENCE PROCEEDINGS, VOLS I-III, 2000, : 2974 - 2976