Managing risk on available transmission capacity using performance contracting

被引:0
|
作者
Beehler, ME [1 ]
机构
[1] Burns & McDonnell, Kansas City, MO 64130 USA
关键词
transmission; power delivery; risk management; Available Transmission Capacity; performance contracting;
D O I
10.1109/TDCLLM.1998.668349
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Deregulation of the electric utility industry is transforming a once vertically integrated organization into four separate, stand alone profit centers: power generation, wholesale power delivery (typically transmission lines and substations 69kV and greater), retail power delivery and energy services sometimes referred to as GENCO, TRANSCO, DISCO and ESCO, respectively. The management and directors of private and public power must make fundamental decisions about the kind of business they believe will maximize their profits or value for their constituents. Performance contracting offers the owner of an asset the ability to reduce the financial risk of inefficiencies, poor performance or system failure by agreeing to share savings resulting from higher efficiencies, improved performance or increased system availability with a contractor that provides some combination of engineering, operations or maintenance for the asset.
引用
收藏
页码:167 / 171
页数:5
相关论文
共 50 条
  • [1] Theoretical and available transmission capacity of UTP
    Umek, A
    [J]. IEEE REGION 10 INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC TECHNOLOGY, VOLS 1 AND 2, 2001, : 698 - 702
  • [2] Increasing the Available Transmission Capacity by using a Dynamic Transient Stability Limit
    Guo, Song
    Wilson, Douglas
    Norris, Sean
    Bialek, Janusz
    [J]. 2011 2ND IEEE PES INTERNATIONAL CONFERENCE AND EXHIBITION ON INNOVATIVE SMART GRID TECHNOLOGIES (ISGT EUROPE), 2011,
  • [3] Contracting Capacity and Perceived Contracting Performance: Nonlinear Effects and the Role of Time
    Yang, Kaifeng
    Hsieh, Jun Yi
    Li, Tzung Shiun
    [J]. PUBLIC ADMINISTRATION REVIEW, 2009, 69 (04) : 681 - 696
  • [4] Managing care through limited risk, bundled contracting
    Aldridge, K
    Evans, J
    Mills, M
    Gilbert, R
    [J]. SYSTEM OF CARE FOR CHILDREN'S MENTAL HEALTH: EXPANDING THE RESEARCH BASE, ANNUAL RESEARCH CONFERENCE, PROCEEDINGS, 1997, : 79 - 84
  • [5] Capacity planning and performance contracting for service facilities
    Jiang, Yabing
    Seidmann, Abraham
    [J]. DECISION SUPPORT SYSTEMS, 2014, 58 : 31 - 42
  • [6] The Risk of Energy Performance Contracting Project
    Shang Tian-cheng
    Zhang Li-rong
    Liu Pei-hong
    Pan Zhen-ni
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 8134 - +
  • [7] Developing capacity and reducing risk? An analysis of federal international contracting
    Harris, Amy Beck
    Brunjes, Benjamin M.
    [J]. INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2022, 25 (05) : 785 - 808
  • [8] Available Transmission Capacity Considering N-1 Risks
    Wang, Yurong
    Yu, Jie
    Wang, Weiyi
    Xue, Bike
    Geng, Jian
    Liu, Yonghui
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 1460 - 1463
  • [9] Managing the risk of nosocomial transmission of prion diseases
    Weber, DJ
    Rutala, WA
    [J]. CURRENT OPINION IN INFECTIOUS DISEASES, 2002, 15 (04) : 421 - 425
  • [10] Estimating the Risk of Contracting COVID-19 in Different Settings Using a Multiscale Transmission Dynamics Model
    Kante, Dramane Sam Idris
    Jebrane, Aissam
    Bouchnita, Anass
    Hakim, Abdelilah
    [J]. MATHEMATICS, 2023, 11 (01)