A user-based bike rebalancing strategy for free-floating bike sharing systems: A bidding model
被引:16
|
作者:
Cheng, Yao
论文数: 0引用数: 0
h-index: 0
机构:
Univ Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R ChinaUniv Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R China
Cheng, Yao
[1
]
Wang, Junwei
论文数: 0引用数: 0
h-index: 0
机构:
Univ Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R ChinaUniv Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R China
Wang, Junwei
[1
]
Wang, Yan
论文数: 0引用数: 0
h-index: 0
机构:
Univ Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R ChinaUniv Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R China
Wang, Yan
[1
]
机构:
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Haking Wong Bldg,Pokfulam Rd, Hong Kong 999077, Peoples R China
Free-floating bike sharing system (FBSS);
User-based bike rebalancing (UBR);
Bidding-model-based incentive mechanism;
(BIM);
STATIC REPOSITIONING PROBLEM;
DEMAND;
RELOCATION;
REDISTRIBUTION;
OPTIMIZATION;
DEPLOYMENT;
ALGORITHM;
NETWORK;
D O I:
10.1016/j.tre.2021.102438
中图分类号:
F [经济];
学科分类号:
02 ;
摘要:
Along with the fast deployment of bike-sharing systems (BSS) nowadays is the bike imbalance problem induced by the demand variability. In this study, we design a user-based bike rebalancing (UBR) strategy to solve the bike imbalance problem in a free-floating bike sharing system (FBSS), where the user arrival and incentive budget allocation of the FBSS are both dynamic. Specifically, we design a dynamic bidding-model-based incentive mechanism (BIM) to progressively determine the incentive price, based on which users are assigned the rebalancing task. The proposed BIM is proved to be budget feasible, incentive compatible, and competitive. We use a set of bike sharing data to numerically verify the effectiveness of BIM in improving the service level of FBSS. Furthermore, we find that the BIM outperforms the post-price-based incentive mechanism (PIM), with its advantage negatively correlated with user irrationality. Some managerial insights and potential research opportunities are provided for urban planners, policy makers and BSS practitioners.
机构:
Jiangsu Second Normal Univ, Sch Math Sci, Nanjing 210013, Peoples R ChinaJiangsu Second Normal Univ, Sch Math Sci, Nanjing 210013, Peoples R China
Niu, Xiaolei
Zhang, Guangyong
论文数: 0引用数: 0
h-index: 0
机构:
Wuxi Univ, Fac Sci, Wuxi 214105, Jiangsu, Peoples R ChinaJiangsu Second Normal Univ, Sch Math Sci, Nanjing 210013, Peoples R China
Zhang, Guangyong
Tian, Lixin
论文数: 0引用数: 0
h-index: 0
机构:
Jiangsu Univ, Energy Dev & Environm Protect Strategy Res Ctr, Zhenjiang 212013, Jiangsu, Peoples R China
Nanjing Normal Univ, Sch Math Sci, Nanjing 210023, Peoples R ChinaJiangsu Second Normal Univ, Sch Math Sci, Nanjing 210013, Peoples R China