Discrete numerical model for analysis of earth pressure balance tunnel excavation

被引:156
|
作者
Maynar, MJM [1 ]
Rodríguez, LEM [1 ]
机构
[1] Univ A Coruna, ETS Ingn Caminos, La Coruna 15192, Spain
关键词
Discrete elements; Numerical models; Particulate media; Soil stabilization; Tunneling;
D O I
10.1061/(ASCE)1090-0241(2005)131:10(1234)
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Two extension projects have been carried out recently on the Madrid Metro, including 97 kin of large-diameter (9.38 m) tunnels. Some technical specifications for the shields (thrust and torque) needed to excavate the tunnels have been analyzed in this work. The soil stability problem at the tunnel face has also been studied. Numerical tools based on a discrete method (particulate materials) have been used for these purposes. Results from the models are compared with real data and show the promising possibilities of the method to design both tunnels and tunneling machines.
引用
收藏
页码:1234 / 1242
页数:9
相关论文
共 50 条
  • [1] Analysis of Chamber Pressure for Earth Pressure Balance Shield Machine by Discrete Numerical Model
    Qu, Fuzheng
    Wu, Li
    Sun, Wei
    [J]. INTELLIGENT ROBOTICS AND APPLICATIONS, PROCEEDINGS, 2009, 5928 : 402 - +
  • [3] Experimental study on thrust force during tunnel excavation with earth pressure balance shield machine
    Zhu He-hua
    Xu Qian-wei
    Liao Shao-ming
    Yu Ning
    Fu De-ming
    Wu Xiang-song
    [J]. ROCK AND SOIL MECHANICS, 2007, 28 (08) : 1587 - 1594
  • [4] MODEL TEST AND NUMERICAL ANALYSIS METHODS IN TUNNEL EXCAVATION PROBLEM
    Cui, Ying
    Kimura, Makoto
    [J]. SOILS AND FOUNDATIONS, 2010, 50 (06) : 915 - 923
  • [5] Discrete element numerical analysis for simulating trapdoor tests to assess loosening earth pressure on tunnel linings
    Hwang, Chaemin
    Choi, Junhyuk
    Jung, Jee-Hee
    Choi, Hangseok
    [J]. GEOMECHANICS AND ENGINEERING, 2024, 38 (06) : 571 - 581
  • [6] Analysis of reasonable thrust force during tunnel excavation in homogeneous soft ground by use of earth pressure balance shield machine
    Department of Civil Engineering, University of Shanghai for Science and Technology, Shanghai 200093, China
    不详
    不详
    [J]. Yantu Gongcheng Xuebao, 2008, 1 (79-85):
  • [7] Investigation of tunnel excavation numerical analysis method for the combined finite-discrete element method
    Li, Peitao
    Liu, Quansheng
    [J]. ENGINEERING ANALYSIS WITH BOUNDARY ELEMENTS, 2024, 165
  • [8] Hydromechanical coupling model and numerical simulation of tunnel excavation
    Ji Xiao-ming
    Wang Yu-hui
    Yang Zhi-yuan
    [J]. ROCK AND SOIL MECHANICS, 2007, 28 : 379 - 384
  • [9] Hydromechanical coupling model and numerical simulation of tunnel excavation
    Ji, Xiao-Ming
    Wang, Yu-Hui
    Yang, Zhi-Yuan
    [J]. Yantu Lixue/Rock and Soil Mechanics, 2007, 28 (SUPPL.): : 379 - 384
  • [10] Safe excavation of large section tunnels with Earth Pressure Balance Tunnel Boring Machine in gassy rock masses: The Sparvo tunnel case study
    Bandini, Annalisa
    Berry, Paolo
    Cormio, Carlo
    Colaiori, Marco
    Lisardi, Andrea
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 67 : 85 - 97