A decision support model for project manager assignments

被引:37
|
作者
Patanakul, Peerasit [1 ]
Milosevic, Dragan Z.
Anderson, Timothy R.
机构
[1] Stevens Inst Technol, Wesley J Howe Sch Technol Management, Hoboken, NJ 07030 USA
[2] Portland State Univ, Dept Engn & Technol Management, Portland, OR 97201 USA
关键词
decision support model; integer programming model; project assignment criteria; project assignment methodology; project assignment process;
D O I
10.1109/TEM.2007.900797
中图分类号
F [经济];
学科分类号
02 ;
摘要
The question, "How to assign projects to project managers?" is considered to be one of the most important questions in project management. Nevertheless, methods to answer this question have not yet been sufficiently addressed in the literature. In practice, even though the question is rather common, practitioners still seek an effective project assignment methodology-especially, for the assignments of project managers of multiple concurrent projects, such as a project manager of new product development projects in typical high-technology industries. To respond to this question, we performed an inductive study to develop a theoretical framework for project assignments, including some significant assignment criteria and processes. We found that to be effective in project assignments, management should consider strategic elements of the organization in project prioritization, project requirements and competencies of project managers in project manager-to-project matching, and some organizational/personal limitations regarding the assignment. An optimization model was developed to apply this framework. This model can assist in assigning projects to project managers for the better performances of projects, project managers, and the organization.
引用
收藏
页码:548 / 564
页数:17
相关论文
共 50 条
  • [1] A Decision Support Model for Project Manager Assignments 2.0
    Choothian, Woraruthai
    Khan, Nausheen
    Mupemba, Kabasele Yves
    Robinson, Kent
    Tunnitisupawong, Venice
    [J]. PROCEEDINGS OF PICMET 09 - TECHNOLOGY MANAGEMENT IN THE AGE OF FUNDAMENTAL CHANGE, VOLS 1-5, 2009, : 1378 - 1387
  • [2] Decision support framework for IT project manager recruitment
    Karrenbauer, Christin
    Gerlach, Jana
    Breitner, Michael H.
    [J]. HELIYON, 2024, 10 (03)
  • [3] Improving Project Manager Decision with Gamification
    Porto, Daniel de Paula
    Ferrari, Fabiano C.
    Fabbri, Sandra C. P. F.
    [J]. SBQS: PROCEEDINGS OF THE 18TH BRAZILIAN SYMPOSIUM ON SOFTWARE QUALITY, 2019, : 286 - 295
  • [4] Toward an Understanding of the Dynamic of Project Manager Assignments: An Empirical Study
    Patanakul, Peerasit
    [J]. PROCEEDINGS OF PICMET 09 - TECHNOLOGY MANAGEMENT IN THE AGE OF FUNDAMENTAL CHANGE, VOLS 1-5, 2009, : 1233 - 1239
  • [5] Governance in a Crisis and the Decision to Replace the Project Manager
    Pinto, Jeffrey
    Davis, Kate
    Turner, Neil
    [J]. PROJECT MANAGEMENT JOURNAL, 2024,
  • [6] A decision-making support system module for project manager selection according to past performance
    Hadad, Yossi
    Keren, Baruch
    Laslo, Zohar
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (04) : 532 - 541
  • [7] Decision Support System Model: Topic Analysis to the IT Project
    Ploywattanawong, Luxsanan
    [J]. ICIET'17: PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INFORMATION AND EDUCATION TECHNOLOGY, 2017, : 171 - 175
  • [8] Optimization Support for Senior Design Project Assignments
    Pine, Gerald
    [J]. INTERFACES, 2008, 38 (06) : 464 - 464
  • [9] How Bias Impacted the Project Manager Decision to Not Terminate a Failing Project
    Strang, Kenneth David
    Vajjhala, Narasimha Rao
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2022, 13 (01)
  • [10] Project manager's decision aid for a radical project cycle reduction
    Hastak, Makarand
    Gokhale, Sanjiv
    Goyan, Kartik
    Hong, TaeHoon
    Safi, Bhavin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2007, 133 (06): : 437 - 446